Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR39-00017 FIR-Aging Inspection3/4/20033/4/20033/4/2003 12:00:00 AM PASS
Another outstanding job performed by a professional contractor. Their work is like a cool breeze on a hot summers day. We need more like them. 3/4/2003 12:29:56 PM
FIR02-00405 INSP-Sprinkler Rough-in/Hydro3/3/20033/4/20033/4/2003 12:00:00 AMAPART
underground hydro test is ok. Above ground hydro test failed. It appears to be leaking in the elevator lobby 3/4/2003 12:27:22 PM
FIR03-00009 INSP-Final Inspection3/4/20033/4/20033/4/2003 12:00:00 AMPFAIL
Remove wrapping form the upright heads in the bail bonds tenant, test the sprinkler monitoring devices, provide signage for the inspectors test valve and control valve per review note #66 and #56, provide inspection tag pre review note #67, provide sign on the bell per review note #68, provide forward flow test per review note #73, provide test papers for the hydro test per review note #69, provide sidewall sprinkler head under the overhead door per review note #62 and plans, provide relief vavle on riser per review note #52, sprinkler pendant in the womens restroom is to close to the register. comply with review note #48. Above ground hydro test is OK 3/4/2003 4:35:40 PM 3/4/2003 4:36:10 PM
FIR03-00049 INSP-Conference3/4/20033/4/20033/4/2003 12:00:00 AMPDONE
###-#### MATT Spoke to Matt about a/v notification in the basement area 3/4/2003 4:20:00 PM