FIR03-00690
| FIR-Aging Inspection | 3/4/2004 | 3/4/2004 | 3/4/2004 12:00:00 AM | | PASS |
|
|
Per Ken this is phased work that is scheduled for completion by 12/04. The first floor is in progress and the head end is completed. There is an agreement with BFD for the phasing. 3/4/2004 9:54:48 AM
|
FIR04-00030
| INSP-Final Inspection | 3/3/2004 | 3/4/2004 | 3/4/2004 12:00:00 AM | A | PASS |
|
|
George ; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD03-02641
| FIRE-Final Inspection | 3/4/2004 | 3/4/2004 | 3/4/2004 12:00:00 AM | A | PASS |
|
|
will have occupant load sign at main exit for structural inspector 3/4/2004 11:25:25 AM
|
BLD03-02641
| FIRE-Final Inspection | 3/4/2004 | 3/4/2004 | 3/4/2004 12:00:00 AM | A | PASS |
|
|
will have occupant load sign at main exit for structural inspector 3/4/2004 11:25:25 AM
|
FIR04-00062
| INSP-Final Inspection | 3/4/2004 | 3/4/2004 | 3/4/2004 12:00:00 AM | P | FAIL |
|
|
this is robs cell could we please schedule it for after 2:30 pm; Phone #: ###-#### Internet Inspection Request from: Terry Owsley Strobes not sync'd; need to test voltage drops and current draw on NAC's 3/4/2004 5:06:05 PM
|
MIS04-00058
| FIR-Final | 3/3/2004 | 3/4/2004 | 3/4/2004 12:00:00 AM | P | PART |
|
|
jerry; Phone #: ###-#### Internet Inspection Request from: Annette Moore needs extinguisher and sign above doors 3/4/2004 1:31:44 PM
|
FIR03-00777
| INSP-Final Inspection | 3/4/2004 | 3/4/2004 | 3/4/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/4/2004 at 8:42:11 AM. Contact: ###-####.
|
FIR03-00593
| INSP-Final Inspection | 3/4/2004 | 3/4/2004 | 3/4/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/4/2004 at 8:43:32 AM. Contact: ###-####.
|