Inspections for the day of: Thursday, March 4, 2004.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC04-00426 Rough-in3/3/20043/4/20043/4/2004 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
MEC04-00426 Pressure Test3/3/20043/4/20043/4/2004 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
MEC04-00552 Rough-in3/3/20043/4/20043/4/2004 12:00:00 AMAPASS
Kevin; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
ESC02-00900 BMP Violation3/4/20043/4/20043/4/2004 12:00:00 AMAFAIL
C/N issued. Protect drain inlets and remove mud from entrance/parking lot. 3/4/2004 8:45:08 AM
ESC03-00927 Site Preparation3/4/20043/4/20043/4/2004 12:00:00 AMAPART
J. Lodman rp ###-####: Remove dirt/debris from hard surface. 3/4/2004 9:27:18 AM
ESC03-00962 Site Preparation3/4/20043/4/20043/4/2004 12:00:00 AMACANC
ESC03-00962 Site Preparation3/4/20043/4/20043/4/2004 12:00:00 AMAFAIL
J. Lodman rp ###-####: J. Wright ###-####: Informed company to install all bmp's by the end of day or a stop work will be issued. 3/4/2004 9:25:56 AM
BLD03-03037 BLD-Footing3/4/20043/4/20043/4/2004 12:00:00 AMPPASS
chris; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Eng. provided on 9' rear wall footing as requested. Rebar throughout 90% installed at time of inspection. 3/4/2004 1:51:06 PM
ESC03-01646 Tracking Control3/4/20043/4/20043/4/2004 12:00:00 AMPFAIL
Informed rp to get all bmp's in place or a stop work can be issued. Will follow up. 3/4/2004 1:24:44 PM
BLD03-01957 BLD-Final3/2/20043/4/20043/4/2004 12:00:00 AMPNR
###-#### ken Needs fire and elec sign offs prior to structural inspection. 3/4/2004 3:08:26 PM