FIR03-00745
| INSP-Final Inspection | 3/3/2004 | 3/4/2004 | 3/4/2004 12:00:00 AM | A | FAIL |
|
|
cantractor was not ready for inspection 3/4/2004 9:55:19 AM
|
FIR03-00295
| INSP-Final Inspection | 3/3/2004 | 3/4/2004 | 3/4/2004 12:00:00 AM | A | FAIL |
|
|
No approved plans on site and no access to inspect the fire sprinklers (ceiling tile has been installed) 3/4/2004 11:15:03 AM
|
FIR03-00713
| INSP-Final Inspection | 3/3/2004 | 3/4/2004 | 3/4/2004 12:00:00 AM | A | FAIL |
|
|
still need the backflow preventor friction loss verified since a different backflow preventor was installed. The flow switch did not activate the alarms (smoke detectors) 3/4/2004 8:46:20 AM
|
BLD02-02873
| BLD-Conference | 3/4/2004 | 3/4/2004 | 3/4/2004 12:00:00 AM | A | DONE |
|
|
I went over life safety requirements in the remodeled area with store representative. They need to provide approved hardware on the mechanical room door. Remove key hardware on the aluminum glass door. Hang fire extinguishers that are sitting on the floor. Provide annual inspection for all fire extinguishers. Final sprinkler permit and test the emergency lights/exit signs in my presence.
|
FIR04-00014
| INSP-Final Inspection | 3/1/2004 | 3/4/2004 | 3/4/2004 12:00:00 AM | A | PASS |
|
|
hood suppression system operated correctly 3/4/2004 10:42:40 AM
|
FIR03-00730
| INSP-Final Inspection | 3/2/2004 | 3/4/2004 | 3/4/2004 12:00:00 AM | P | PASS |
|
|
fire alarm finaled 3/4/2004 3:51:52 PM
|
FIR03-00448
| INSP-Sprinkler Rough-in/Hydro | 3/2/2004 | 3/4/2004 | 3/4/2004 12:00:00 AM | P | PART |
|
|
Inspection was a hydro test. The hydro test passed but will need to be done again due to more sprinkler heads being cut into the piping as the project gets closer to completion 3/4/2004 3:44:08 PM
|
BLD03-01957
| FIRE-Final Inspection | 3/4/2004 | 3/4/2004 | 3/4/2004 12:00:00 AM | P | PART |
|
|
A temporary occupancy was given on the fire sprinkler permit with dave miller's permission until the backflow can be verified and the alarms work.
|
FIR03-00713
| INSP-Final Inspection | 3/4/2004 | 3/4/2004 | 3/4/2004 12:00:00 AM | P | PART |
|
|
A temporary occupancy was given with dave miller's permission until the backflow can be verified and the alarms work.
|
FIR03-00364
| INSP-Final Inspection | 3/4/2004 | 3/4/2004 | 3/4/2004 12:00:00 AM | P | PASS |
|
|
hood suppression system operated correctly
|
BLD03-02369
| FIRE-Final Inspection | 3/4/2004 | 3/4/2004 | 3/4/2004 12:00:00 AM | P | PART |
|
|
Phase 1 is ok to occupy 3/4/2004 2:25:11 PM
|