Inspections for the day of: Tuesday, March 4, 2008.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-00661 BMP Violation3/4/20083/4/20083/4/2008 3:45:03 PMPFAIL
**Notice of Correction**
-Heavy sediment tracking on Garverdale and Wildwood
-Trash debris not in container around lots
-No Sediment BMP's inplace
-No construction entrance to lots
-No concrete washout pit
Failure to comply by 3/7/08 will result in a stop work order.
Will re-inspect on 3/7/08
CAS#460
###-####
ESC07-00669 BMP Violation3/4/20083/4/20083/4/2008 3:44:48 PMPFAIL
**Notice of Correction**
-Heavy sediment tracking on Garverdale and Wildwood
-Trash debris not in container around lots
-No Sediment BMP's inplace
-No construction entrance to lots
-No concrete washout pit
Failure to comply by 3/7/08 will result in a stop work order.
Will re-inspect on 3/7/08
CAS#460
###-####
ESC07-00668 BMP Violation3/4/20083/4/20083/4/2008 3:44:34 PMPFAIL
**Notice of Correction**
-Heavy sediment tracking on Garverdale and Wildwood
-Trash debris not in container around lots
-No Sediment BMP's inplace
-No construction entrance to lots
-No concrete washout pit
Failure to comply by 3/7/08 will result in a stop work order.
Will re-inspect on 3/7/08
CAS#460
###-####
ESC07-00667 BMP Violation3/4/20083/4/20083/4/2008 3:44:14 PMPFAIL
**Notice of Correction**
-Heavy sediment tracking on Garverdale and Wildwood
-Trash debris not in container around lots
-No Sediment BMP's inplace
-No construction entrance to lots
-No concrete washout pit
Failure to comply by 3/7/08 will result in a stop work order.
Will re-inspect on 3/7/08
CAS#460
###-####
ESC07-00666 BMP Violation3/4/20083/4/20083/4/2008 3:43:53 PMPFAIL
**Notice of Correction**
-Heavy sediment tracking on Garverdale and Wildwood
-Trash debris not in container around lots
-No Sediment BMP's inplace
-No construction entrance to lots
-No concrete washout pit
Failure to comply by 3/7/08 will result in a stop work order.
Will re-inspect on 3/7/08
CAS#460
###-####
ESC07-00045 Site Final3/4/20083/4/20083/4/2008 2:56:35 PMPPASS
Lot Stabilized
ESC07-01565 Tracking Control3/4/20083/4/20083/4/2008 2:55:49 PMPPART
Discussed with RP (Chris Mason ###-####) over tracking of of lot. He gave me there contingency plan. Wil re-inspect on the 7th.
CAS#460
###-####
ESC07-01472 Random Inspection3/4/20083/4/20083/4/2008 2:42:29 PMPPART
Called RP and instructed that entrance on Shamrock needs to adressed with underlayment and washed rock since they are moving out dirt off of project. Will re-inspect on Friday the the 6th of March.
CAS#460
###-####
ESC07-01455 Conference3/4/20083/4/20083/4/2008 2:02:34 PMPDONE
Went over the guidelines with (RP) regarding the stop work order that has taken place on the project that he will be developing. This occured yesterday the 3/3/08 at 5pm. Work will comence on Wensday 3/5. They will removing trees to go ahead and install there BMPs for the project. I have iven the Ok to do this so BMPs can be intialized.
CAS#460
###-####