BLD08-02183
| BLD-Framing/Rough-in | 3/4/2009 | 3/4/2009 | 3/4/2009 4:09:08 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 3/4/2009 at 7:07:05 AM. Contact: ###-####.
|
BLD08-02182
| BLD-Framing/Rough-in | 3/4/2009 | 3/4/2009 | 3/4/2009 3:37:36 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/4/2009 at 7:06:24 AM. 2nd. floor, 1st. layer, both sides of 5/8 type x rock for 2hr. fire wall.
|
BLD08-02184
| BLD-Framing/Rough-in | 3/4/2009 | 3/4/2009 | 3/4/2009 3:36:28 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/4/2009 at 7:07:57 AM. Contact: ###-####. 2nd. floor, 1st. layer of 5/8 type x rock, both sides for 2hr. fire wall.
|
BLD08-02185
| BLD-Framing/Rough-in | 3/4/2009 | 3/4/2009 | 3/4/2009 3:35:30 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/4/2009 at 7:08:27 AM. Contact: ###-####. 2nd. floor, 1st. layer of 5/8 type x rock, both sides.
|
BLD08-02187
| BLD-Framing/Rough-in | 3/4/2009 | 3/4/2009 | 3/4/2009 3:24:34 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/4/2009 at 7:04:11 AM. Contact: ###-####. 2nd. floor, 2nd layer, both sides of 5/8 type x rock for 2hr. fire wall.
|
BLD08-02186
| BLD-Framing/Rough-in | 3/4/2009 | 3/4/2009 | 3/4/2009 3:21:23 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/4/2009 at 7:03:22 AM. Contact: ###-####. 2nd. floor, 1st. layer, both sides, 5/8 type x rock for 2hr. wall.
|
BLD08-02188
| BLD-Framing/Rough-in | 3/4/2009 | 3/4/2009 | 3/4/2009 3:18:50 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/4/2009 at 7:05:24 AM. Contact: ###-####. 2nd. floor, 2nd layer of 5/8 type x rock both sides.
|
ESC08-00880
| Tracking Control | 3/4/2009 | 3/4/2009 | 3/4/2009 3:17:08 PM | P | PART |
|
|
Trackou has been cleaned up. Contractor is sweeping as needed to keep trackout at a minumum.
|
ESC08-00881
| Tracking Control | 3/4/2009 | 3/4/2009 | 3/4/2009 3:16:14 PM | P | PART |
|
|
Contractor has cleaned up trackout. Is sweeping as needed nto keep trackout at a minimum.
|
ESC08-00882
| Tracking Control | 3/4/2009 | 3/4/2009 | 3/4/2009 3:14:45 PM | P | PART |
|
|
Contractor has cleaned up track out. Is sweeping as needed to keep trackout at a minimum.
|
ESC08-00883
| Tracking Control | 3/4/2009 | 3/4/2009 | 3/4/2009 3:13:49 PM | P | PART |
|
|
Trackout has been cleaned up. contractor is sweeping as needed to keep trackout at a minimum.
|
BLD08-02190
| BLD-Framing/Rough-in | 3/3/2009 | 3/4/2009 | 3/4/2009 3:12:35 PM | A | PASS |
|
|
Jim Phone #: ###-####. 1st. floor, 1st layer of 5/8 type x rock , remaining side for 2hr. fire wall.
|
BLD08-02192
| BLD-Framing/Rough-in | 3/3/2009 | 3/4/2009 | 3/4/2009 3:11:30 PM | A | PASS |
|
|
Jim Phone #: ###-####. 1st. floor, 1st. layer of type x rock, remaining side for 2hr. fire wall.
|
BLD08-02191
| BLD-Framing/Rough-in | 3/3/2009 | 3/4/2009 | 3/4/2009 3:09:23 PM | A | NR |
|
|
Jim Phone #: ###-####
|
BLD08-02193
| BLD-Framing/Rough-in | 3/3/2009 | 3/4/2009 | 3/4/2009 3:08:24 PM | A | NR |
|
|
Jim Phone #: ###-####
|
ESC08-00888
| Tracking Control | 3/4/2009 | 3/4/2009 | 3/4/2009 2:28:38 PM | P | PART |
|
|
Contractor has swept trackout and is sweeping as needed to keep trackout at a minimum. A wheel wash out at a control piont will be set up in future if equipment needs to cross soup st. to avoid trackout.
|
ESC08-00886
| Tracking Control | 3/4/2009 | 3/4/2009 | 3/4/2009 2:25:44 PM | P | PART |
|
|
Contractor has cleaned trackout and is sweeping as needed to keep trackout at a minimum. Sub contractor who caused the excessive trrackout is completed with work for this phase. Per contractor, no heavy equipment should not need to cross soup street any longer and a wheel wash will be set up if needed in the future to avoid the trackout.
|
ESC08-00885
| Tracking Control | 3/4/2009 | 3/4/2009 | 3/4/2009 2:21:07 PM | P | PART |
|
|
Contractor has swept street on as needed basis to keep track out to a minimum. Sub contractor that made the track out is completed with work and will not need to cross soup with heavy equipment for this phase of the project. General contractor noted that in future their will be a wheel wash area at a controlled point to avoid trackout in the future.
|
BLD08-02196
| BLD-Framing/Rough-in | 3/4/2009 | 3/4/2009 | 3/4/2009 2:17:16 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 3/4/2009 at 7:10:23 AM. Contact: ###-####.
|
BLD08-02195
| BLD-Framing/Rough-in | 3/4/2009 | 3/4/2009 | 3/4/2009 2:17:03 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 3/4/2009 at 7:09:42 AM. Contact: ###-####.
|
BLD08-02194
| BLD-Framing/Rough-in | 3/4/2009 | 3/4/2009 | 3/4/2009 2:16:48 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 3/4/2009 at 7:09:05 AM. Contact: ###-####.
|
BLD08-02393
| BLD-Foundation | 3/3/2009 | 3/4/2009 | 3/4/2009 11:41:33 AM | A | PASS |
|
|
Ian Phone #: ###-####. Stemwall for dumpster enclosure ok.
|
ESC08-00979
| Random Inspection | 3/4/2009 | 3/4/2009 | 3/4/2009 11:39:58 AM | A | PASS |
|
|
|
ESC08-00916
| Site Preparation | 3/4/2009 | 3/4/2009 | 3/4/2009 8:57:58 AM | A | PASS |
|
|
esc permit sign posted.
|
BLD08-02256
| BLD-Foundation | 3/4/2009 | 3/4/2009 | 3/4/2009 8:56:43 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 3/4/2009 at 7:28:20 AM. Contact: ###-####.
|
BLD08-02169
| BLD-Final | 3/3/2009 | 3/4/2009 | 3/4/2009 8:05:18 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 3/3/2009 at 4:41:53 PM. Contact: ###-####.
|
BLD08-02169
| DOC - Permit Finaled | 3/4/2009 | 3/4/2009 | 3/4/2009 8:05:10 AM | P | PASS |
|
|
ok for perm. occ.
|