Inspections for the day of: Wednesday, March 4, 2009.
Number of inspections: 27
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-02183 BLD-Framing/Rough-in3/4/20093/4/20093/4/2009 4:09:08 PMPNR
Scheduled by a contractor via Hello! on 3/4/2009 at 7:07:05 AM. Contact: ###-####.
BLD08-02182 BLD-Framing/Rough-in3/4/20093/4/20093/4/2009 3:37:36 PMPPASS
Scheduled by a contractor via Hello! on 3/4/2009 at 7:06:24 AM. 2nd. floor, 1st. layer, both sides of 5/8 type x rock for 2hr. fire wall.
BLD08-02184 BLD-Framing/Rough-in3/4/20093/4/20093/4/2009 3:36:28 PMPPASS
Scheduled by a contractor via Hello! on 3/4/2009 at 7:07:57 AM. Contact: ###-####. 2nd. floor, 1st. layer of 5/8 type x rock, both sides for 2hr. fire wall.
BLD08-02185 BLD-Framing/Rough-in3/4/20093/4/20093/4/2009 3:35:30 PMPPASS
Scheduled by a contractor via Hello! on 3/4/2009 at 7:08:27 AM. Contact: ###-####. 2nd. floor, 1st. layer of 5/8 type x rock, both sides.
BLD08-02187 BLD-Framing/Rough-in3/4/20093/4/20093/4/2009 3:24:34 PMPPASS
Scheduled by a contractor via Hello! on 3/4/2009 at 7:04:11 AM. Contact: ###-####. 2nd. floor, 2nd layer, both sides of 5/8 type x rock for 2hr. fire wall.
BLD08-02186 BLD-Framing/Rough-in3/4/20093/4/20093/4/2009 3:21:23 PMPPASS
Scheduled by a contractor via Hello! on 3/4/2009 at 7:03:22 AM. Contact: ###-####. 2nd. floor, 1st. layer, both sides, 5/8 type x rock for 2hr. wall.
BLD08-02188 BLD-Framing/Rough-in3/4/20093/4/20093/4/2009 3:18:50 PMPPASS
Scheduled by a contractor via Hello! on 3/4/2009 at 7:05:24 AM. Contact: ###-####. 2nd. floor, 2nd layer of 5/8 type x rock both sides.
ESC08-00880 Tracking Control3/4/20093/4/20093/4/2009 3:17:08 PMPPART
Trackou has been cleaned up. Contractor is sweeping as needed to keep trackout at a minumum.
ESC08-00881 Tracking Control3/4/20093/4/20093/4/2009 3:16:14 PMPPART
Contractor has cleaned up trackout. Is sweeping as needed nto keep trackout at a minimum.
ESC08-00882 Tracking Control3/4/20093/4/20093/4/2009 3:14:45 PMPPART
Contractor has cleaned up track out. Is sweeping as needed to keep trackout at a minimum.
ESC08-00883 Tracking Control3/4/20093/4/20093/4/2009 3:13:49 PMPPART
Trackout has been cleaned up. contractor is sweeping as needed to keep trackout at a minimum.
BLD08-02190 BLD-Framing/Rough-in3/3/20093/4/20093/4/2009 3:12:35 PMAPASS
Jim Phone #: ###-####. 1st. floor, 1st layer of 5/8 type x rock , remaining side for 2hr. fire wall.
BLD08-02192 BLD-Framing/Rough-in3/3/20093/4/20093/4/2009 3:11:30 PMAPASS
Jim Phone #: ###-####. 1st. floor, 1st. layer of type x rock, remaining side for 2hr. fire wall.
BLD08-02191 BLD-Framing/Rough-in3/3/20093/4/20093/4/2009 3:09:23 PMANR
Jim Phone #: ###-####
BLD08-02193 BLD-Framing/Rough-in3/3/20093/4/20093/4/2009 3:08:24 PMANR
Jim Phone #: ###-####
ESC08-00888 Tracking Control3/4/20093/4/20093/4/2009 2:28:38 PMPPART
Contractor has swept trackout and is sweeping as needed to keep trackout at a minimum. A wheel wash out at a control piont will be set up in future if equipment needs to cross soup st. to avoid trackout.
ESC08-00886 Tracking Control3/4/20093/4/20093/4/2009 2:25:44 PMPPART
Contractor has cleaned trackout and is sweeping as needed to keep trackout at a minimum. Sub contractor who caused the excessive trrackout is completed with work for this phase. Per contractor, no heavy equipment should not need to cross soup street any longer and a wheel wash will be set up if needed in the future to avoid the trackout.
ESC08-00885 Tracking Control3/4/20093/4/20093/4/2009 2:21:07 PMPPART
Contractor has swept street on as needed basis to keep track out to a minimum. Sub contractor that made the track out is completed with work and will not need to cross soup with heavy equipment for this phase of the project. General contractor noted that in future their will be a wheel wash area at a controlled point to avoid trackout in the future.
BLD08-02196 BLD-Framing/Rough-in3/4/20093/4/20093/4/2009 2:17:16 PMPNR
Scheduled by a contractor via Hello! on 3/4/2009 at 7:10:23 AM. Contact: ###-####.
BLD08-02195 BLD-Framing/Rough-in3/4/20093/4/20093/4/2009 2:17:03 PMPNR
Scheduled by a contractor via Hello! on 3/4/2009 at 7:09:42 AM. Contact: ###-####.
BLD08-02194 BLD-Framing/Rough-in3/4/20093/4/20093/4/2009 2:16:48 PMPNR
Scheduled by a contractor via Hello! on 3/4/2009 at 7:09:05 AM. Contact: ###-####.
BLD08-02393 BLD-Foundation3/3/20093/4/20093/4/2009 11:41:33 AMAPASS
Ian Phone #: ###-####. Stemwall for dumpster enclosure ok.
ESC08-00979 Random Inspection3/4/20093/4/20093/4/2009 11:39:58 AMAPASS
ESC08-00916 Site Preparation3/4/20093/4/20093/4/2009 8:57:58 AMAPASS
esc permit sign posted.
BLD08-02256 BLD-Foundation3/4/20093/4/20093/4/2009 8:56:43 AMAPASS
Scheduled by a contractor via Hello! on 3/4/2009 at 7:28:20 AM. Contact: ###-####.
BLD08-02169 BLD-Final3/3/20093/4/20093/4/2009 8:05:18 AMAPASS
Scheduled by a contractor via Hello! on 3/3/2009 at 4:41:53 PM. Contact: ###-####.
BLD08-02169 DOC - Permit Finaled3/4/20093/4/20093/4/2009 8:05:10 AMPPASS
ok for perm. occ.