Inspections for the day of: Thursday, March 4, 2010.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR03-00082 FIR-Aging Inspection3/4/20103/4/20103/8/2010 3:15:22 PM NR
Information forwarded to Scott for further action with nonreponsive contractor.
FIR03-00052 FIR-Aging Inspection3/4/20103/4/20103/8/2010 3:15:04 PM NR
Information forwarded to Scott for further action with nonreponsive contractor.
BLD10-00152 FIRE-Final Inspection3/4/20103/4/20103/4/2010 3:31:20 PMACANC
When the signage is provided on the fire alarm access door and signage is provided on the fire sprinkler riser door, the project related fire alarm permit is passed the life can be passed for this project.
FIR09-00674 INSP-Final Inspection3/4/20103/4/20103/4/2010 3:26:08 PMPFAIL
Provide a map at the facp as discussed, provide corrected address at the monitoring station, provide as-builts that show the manual pull and smoke detector combined on zone 1, with zone 2 as a tamper, zone three as a PIV and zone 4 as the flow switch. Change out the submittal data sheet for the AES panel from a model 7750 to the 7788 which was actually installed. NetCon was a 5. All other items are passed.
FIR09-00600 INSP-Final Inspection3/3/20103/4/20103/4/2010 3:16:52 PMPPASS
Permit finaled
BLD10-00384 FIRE-Final Inspection3/3/20103/4/20103/4/2010 2:13:50 PMAPASS
Life safety passed
BLD10-00395 FIRE-Final Inspection3/3/20103/4/20103/4/2010 10:25:11 AMAFAIL
See the red line comments written on the city approved floor plan. Items include the repair of existing exit signs and providing additional emergency lighting in the conference and break rooms.
FIR10-00048 INSP-Final Inspection3/3/20103/4/20103/4/2010 10:20:54 AMAPASS
Permit finaled