BLD13-00124
| FIRE-Final Inspection | 3/4/2013 | 3/4/2013 | 3/5/2013 5:27:27 PM | P | PASS |
|
|
|
BLD12-00944
| FIRE-Final Inspection | 3/4/2013 | 3/4/2013 | 3/4/2013 4:03:23 PM | P | PASS |
|
|
Fire life safety finaled.
|
FIR13-00089
| INSP-Sprinkler Rough-in | 3/4/2013 | 3/4/2013 | 3/4/2013 4:00:06 PM | P | PART |
|
|
Rough-in okayed to cover.
|
FIR12-00624
| INSP-Final Inspection | 3/4/2013 | 3/4/2013 | 3/4/2013 3:17:37 PM | A | PASS |
|
|
Fire sprinkler permit final approved.
|
FIR12-00650
| INSP-Conference | 3/4/2013 | 3/4/2013 | 3/4/2013 3:17:04 PM | A | DONE |
|
|
Regarding project inspection schedule.
|
BLD13-00218
| FIRE-Final Inspection | 3/1/2013 | 3/4/2013 | 3/4/2013 3:14:01 PM | A | FAIL |
|
|
Need to repair two EM lights/exit signs, post max. occupant load signs per plan review comments and red-line annotations.
|
FIR12-00747
| INSP-Final Inspection | 3/4/2013 | 3/4/2013 | 3/4/2013 3:12:24 PM | A | PASS |
|
|
Fire sprinkler work passed final walkthrough.
|