Inspections for the day of: Monday, March 4, 2013.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-02588 FIRE-Final Inspection3/4/20133/4/20133/4/2013 3:42:12 PMPFAIL
Need to comply with the electric gate requirements as noted on the city approved plans or contact the fire dept for a variance.
BLD13-00177 FIRE-Final Inspection3/1/20133/4/20133/4/2013 3:28:53 PMPPASS
Life safety passed. The exit sign has been removed from the rear door.
FIR12-00414 FIR-Aging Inspection3/4/20133/4/20133/4/2013 3:27:39 PM NR
work is in progress
BLD12-00343 FIRE-Final Inspection3/4/20133/4/20133/4/2013 3:27:00 PMPPASS
Life safety passed
FIR12-00711 INSP-Final Inspection3/4/20133/4/20133/4/2013 3:25:33 PMPPASS
Permit finaled. Smoke alarm added and tested.
FIR12-00750 INSP-Final Inspection3/4/20133/4/20133/4/2013 2:13:16 PMPPASS
permit finaled
FIR13-00043 INSP-Sprinkler Rough-in3/1/20133/4/20133/4/2013 2:06:02 PMACANC
I stopped at the job site but the plans are locked in the job box. Per Mark Jensen the inspection will be rescheduled.
FIR12-00750 INSP-Sprinkler Rough-in/Hydro3/4/20133/4/20133/4/2013 12:28:48 PMAPASS
Overhead hydro test passed
FIR12-00427 INSP-Supply line flush2/28/20133/4/20133/4/2013 10:05:32 AMAPASS
The underground supply line and the remote FDC supply line fludh passed
BLD13-00177 FIRE-Final Inspection3/4/20133/4/20133/4/2013 9:42:52 AMAFAIL
Repair or remove the non-functional, non-required exit signs and emergency lights. If exit sign at the rear door remains then code compliant hardware will be required.
BLD12-01911 FIRE-Final Inspection3/1/20133/4/20133/4/2013 8:46:30 AMAPASS
Life safety passed