BLD12-02588
| FIRE-Final Inspection | 3/4/2013 | 3/4/2013 | 3/4/2013 3:42:12 PM | P | FAIL |
|
|
Need to comply with the electric gate requirements as noted on the city approved plans or contact the fire dept for a variance.
|
BLD13-00177
| FIRE-Final Inspection | 3/1/2013 | 3/4/2013 | 3/4/2013 3:28:53 PM | P | PASS |
|
|
Life safety passed. The exit sign has been removed from the rear door.
|
FIR12-00414
| FIR-Aging Inspection | 3/4/2013 | 3/4/2013 | 3/4/2013 3:27:39 PM | | NR |
|
|
work is in progress
|
BLD12-00343
| FIRE-Final Inspection | 3/4/2013 | 3/4/2013 | 3/4/2013 3:27:00 PM | P | PASS |
|
|
Life safety passed
|
FIR12-00711
| INSP-Final Inspection | 3/4/2013 | 3/4/2013 | 3/4/2013 3:25:33 PM | P | PASS |
|
|
Permit finaled. Smoke alarm added and tested.
|
FIR12-00750
| INSP-Final Inspection | 3/4/2013 | 3/4/2013 | 3/4/2013 2:13:16 PM | P | PASS |
|
|
permit finaled
|
FIR13-00043
| INSP-Sprinkler Rough-in | 3/1/2013 | 3/4/2013 | 3/4/2013 2:06:02 PM | A | CANC |
|
|
I stopped at the job site but the plans are locked in the job box. Per Mark Jensen the inspection will be rescheduled.
|
FIR12-00750
| INSP-Sprinkler Rough-in/Hydro | 3/4/2013 | 3/4/2013 | 3/4/2013 12:28:48 PM | A | PASS |
|
|
Overhead hydro test passed
|
FIR12-00427
| INSP-Supply line flush | 2/28/2013 | 3/4/2013 | 3/4/2013 10:05:32 AM | A | PASS |
|
|
The underground supply line and the remote FDC supply line fludh passed
|
BLD13-00177
| FIRE-Final Inspection | 3/4/2013 | 3/4/2013 | 3/4/2013 9:42:52 AM | A | FAIL |
|
|
Repair or remove the non-functional, non-required exit signs and emergency lights. If exit sign at the rear door remains then code compliant hardware will be required.
|
BLD12-01911
| FIRE-Final Inspection | 3/1/2013 | 3/4/2013 | 3/4/2013 8:46:30 AM | A | PASS |
|
|
Life safety passed
|