BLD13-02706
| FIRE-Final Inspection | 3/4/2014 | 3/4/2014 | 3/4/2014 4:08:06 PM | P | PASS |
|
|
Fire life safety inspection completed. Previous correction items finished.
|
FIR14-00121
| INSP-Sprinkler Rough-in | 3/4/2014 | 3/4/2014 | 3/4/2014 3:30:51 PM | P | PART |
|
|
Okay to cover sheetrock ceilings at the 3rd floor elevator lobby- ref. dated annotations on approved plans.
|
BLD13-02797
| FIRE-Conference | 3/4/2014 | 3/4/2014 | 3/4/2014 3:27:51 PM | P | DONE |
|
|
Regarding project related fire sprinkler work.
|
BLD13-02294
| FIRE-Final Inspection | 3/3/2014 | 3/4/2014 | 3/4/2014 1:33:45 PM | A | PASS |
|
|
Fire life safety final approved.
|
BLD14-00323
| FIRE-Final Inspection | 3/3/2014 | 3/4/2014 | 3/4/2014 10:51:28 AM | A | PASS |
|
|
Noted correction items finished. Fire life safety passed.
|
FIR14-00033
| INSP-Final Inspection | 3/3/2014 | 3/4/2014 | 3/4/2014 10:32:01 AM | A | PASS |
|
|
Previous C/N items verified for completion. Final walkthrough passed. Fire sprinkler permit finaled.
|