Inspections for the day of: Wednesday, March 4, 2015.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRex Boyles
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE13-00624 ELE-Aging Inspection3/4/20153/4/20153/10/2015 9:55:28 AM DONE
left message for Dave
ELE13-00227 ELE-Aging Inspection3/4/20153/4/20153/4/2015 3:37:55 PM DONE
Patty will look into it
ELE15-00561 Electrical Rough-In3/3/20153/4/20153/4/2015 3:30:53 PMPPASS
Inspection requested via web by Mike Swift r/i walls ok
ELE15-00169 Electrical Rough-In3/3/20153/4/20153/4/2015 3:04:18 PMPPASS
Rough In for the 2nd floor. Steve Hook is contact at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce 2nd floor walls ok to cover
ELE15-00414 Permanent Service3/4/20153/4/20153/4/2015 2:18:00 PMPPASS
cal Phone #: ###-#### Inspection requested via web by cal crosby p/s u/g n ok house panel and 8 units in meter pack
GCE14-00133 GCE-Final3/4/20153/4/20153/4/2015 1:47:13 PMPFAIL
Brandon ###-#### - code: 0901+enter 210.12-AFCI required in bdrms. (upst.)
ELE15-00558 Conference3/3/20153/4/20153/4/2015 12:29:15 PMADONE
Call half hour before to meet there // Michael Phone #: ###-#### discuss service upgrade and reusing existing loadcenter after relocating to meet required clearances. Install new grounding electrodes and conductors.
ELE15-00562 Electrical Rough-In3/4/20153/4/20153/4/2015 11:46:14 AMAPASS
the place does not open til 9am. We will be there at 9 Phone #: ###-#### Inspection requested via web by Tim Dunlop UL listed products ok
ELE14-03246 Electrical Rough-In3/3/20153/4/20153/4/2015 11:20:06 AMAPASS
Dave. Tower #3 5th floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy tower3 level 5 rms 510 thru 515 only r/i ok
ELE14-03402 Electrical Rough-In3/3/20153/4/20153/4/2015 10:21:15 AMAPASS
underground cover Phone #: ###-#### Inspection requested via web by Celinda Winters r/i u. ground conduits to chiller ok to cover
ELE15-00495 Electrical Rough-In3/3/20153/4/20153/4/2015 9:56:16 AMAPASS
Cast in place lights and PVC in formed concrete walls. Phone #: ###-#### Inspection requested via web by Toby Groves ramp lights r/i ok 100%
ELE15-00227 Electrical Rough-In3/3/20153/4/20153/4/2015 9:36:20 AMAPASS
We need a wall cover inspection for tomorrow. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker 3rd floor r/i walls 100% ok r/i 4th floor walls 100% ok