ELE20-00232
| Final | 3/4/2020 | 3/4/2020 | 3/4/2020 2:25:11 PM | P | PASS |
|
|
Please call prior to arrival for access. ###-#### Phone #: ###-#### Inspection requested via web by Patrick Paz Final ok
|
ELE20-00696
| Electrical Rough-In | 3/4/2020 | 3/4/2020 | 3/4/2020 2:24:55 PM | P | PASS |
|
|
Rough In Ceiling Inspection. Please contact Alfred Dixon 10 minutes prior to inspection so he can meet you there. ###-#### Thank you. Inspection requested via web by Cathy Duchek Ceiling ok to cover
|
ELE20-00696
| Final | 3/4/2020 | 3/4/2020 | 3/4/2020 2:24:33 PM | P | PASS |
|
|
Inspection. Please contact Alfred Dixon 10 minutes prior to inspection so he can meet you there. ###-#### Thank you. Inspection requested via web by Cathy Duchek final ok
|
ELE20-00729
| Electrical Rough-In | 3/3/2020 | 3/4/2020 | 3/4/2020 1:35:26 PM | P | PASS |
|
|
Please check in with the receptionist at the front desk. If possible please call me 20 minutes prior to arrival. Phone #: ###-#### Inspection requested via web by John Duncan Offices 222A, B & C walls only ok to cover. (No ceiling tiles were removed)
|
ELE20-00760
| Rough-In Permanent Service | 3/4/2020 | 3/4/2020 | 3/4/2020 1:15:24 PM | P | PASS |
|
|
LOCK BOX CODE 7777 Phone #: ###-#### Inspection requested via web by Hidajet Zahic Complete rewire. Rough in ok p/s u/g n ok
|
ELE19-02949
| Final | 3/4/2020 | 3/4/2020 | 3/4/2020 12:48:11 PM | P | PASS |
|
|
Swimming pool electrical final Phone #: ###-#### Inspection requested via web by Lars Johnson pool only final ok
|
ELE20-00676
| Rough-In Permanent Service | 3/3/2020 | 3/4/2020 | 3/4/2020 11:38:17 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk rough in ok p/s u/g n ok
|
ELE19-04871
| Final | 3/3/2020 | 3/4/2020 | 3/4/2020 10:47:41 AM | A | PASS |
|
|
Home owners are to be home Phone #: ###-#### Inspection requested via web by Jay Symonds Garage only final ok
|
ELE20-00178
| Final | 3/3/2020 | 3/4/2020 | 3/4/2020 10:22:40 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kyle Dillon Sauna only final ok
|
ELE20-00404
| Electrical Rough-In | 3/3/2020 | 3/4/2020 | 3/4/2020 9:46:23 AM | A | PASS |
|
|
Underground inspection for Building #12. Thank you Phone #: ###-#### Inspection requested via web by Stuart Welton Underground along back side of building ok to cover
|
ELE20-00086
| Electrical Rough-In | 3/4/2020 | 3/4/2020 | 3/4/2020 9:09:30 AM | A | PASS |
|
|
Requesting 9:00 am inspection time. Relocate existing sign to new location due to street construction. Phone #: ###-#### Inspection requested via web by Ken Olsen Original sign reused. Only relocated rough in ok
|
ELE19-04687
| Final | 3/3/2020 | 3/4/2020 | 3/4/2020 8:55:03 AM | A | PASS |
|
|
access: 2020 Phone #: ###-#### Inspection requested via web by David Nelson final ok
|
ELE20-00392
| Electrical Rough-In | 3/3/2020 | 3/4/2020 | 3/4/2020 8:36:00 AM | A | PASS |
|
|
Please call 30 mins prior as we are not on site. Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ceiling only ok to cover (Will need to pop 1 tile in electrical room to check open gutter above panel. Electrician was still pulling wire at time of inspection
|
ELE20-00740
| Temporary Service | 3/3/2020 | 3/4/2020 | 3/4/2020 8:20:02 AM | A | PASS |
|
|
Braydon Johnson is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce t/s o/h n ok
|