BLD1054959
| INSP - Letter of compliance | 3/5/1997 | 3/5/1997 | 3/5/1997 12:00:00 AM | | PASS |
|
|
/ / 350 - C/C #11650
|
BLD1054959
| INSP - Letter of compliance | 3/5/1997 | 3/5/1997 | 3/5/1997 12:00:00 AM | | PASS |
|
|
/ / 350 - C/C #11650
|
BLD95-01438
| INSP - Conference | 3/5/1997 | 3/5/1997 | 3/5/1997 12:00:00 AM | | PASS |
|
|
/ / 350 - TALKED WITH CONTRACTOR ABOUT FIRE HYD. AND WENT OVER FIRE BL FLR.
|
BLD97-00321
| INSP - Footings | 3/4/1997 | 3/5/1997 | 3/5/1997 12:00:00 AM | A | PASS |
|
|
03/05/97 350 - ftns. poured, setbacks ok
|
MEC97-00555
| INSP - Rough-in & Gas Pressure | 3/4/1997 | 3/5/1997 | 3/5/1997 12:00:00 AM | A | PART |
|
|
03/05/97 350 - R/I OK, PT NOT ON, FAILED
|
MEC97-00558
| INSP - Framing/ Rough-in | 3/4/1997 | 3/5/1997 | 3/5/1997 12:00:00 AM | A | PASS |
|
|
03/05/97 350 - r/i ok
|
MEC97-00559
| INSP - Gas pressure test | 3/4/1997 | 3/5/1997 | 3/5/1997 12:00:00 AM | A | FAIL |
|
|
03/05/97 350 - NEW HEALTH WISE BLDG..GAS PIPING AND A BOILER PRESSURE TEST NEEDS TO BE 60# TEST, AS THIS MUST BE A 2# SYSTEM, THE BOI 1,000MBH
|
MEC96-03275
| INSP - Final | 3/4/1997 | 3/5/1997 | 3/5/1997 12:00:00 AM | A | NH |
|
|
03/05/97 350 - HOUSE LOCKED UP, LEFT NOTICE
|
MEC96-03275
| INSP - Final | 3/4/1997 | 3/5/1997 | 3/5/1997 12:00:00 AM | A | NH |
|
|
03/05/97 350 - HOUSE LOCKED UP, LEFT NOTICE
|
MEC97-00343
| INSP - Final | 3/4/1997 | 3/5/1997 | 3/5/1997 12:00:00 AM | A | PASS |
|
|
03/05/97 350 - FINAL
|
MEC97-00343
| INSP - Final | 3/4/1997 | 3/5/1997 | 3/5/1997 12:00:00 AM | A | PASS |
|
|
03/05/97 350 - FINAL
|
MEC97-00519
| INSP - Framing/ Rough-in | 3/4/1997 | 3/5/1997 | 3/5/1997 12:00:00 AM | A | PASS |
|
|
03/05/97 350 - EXHAUST DUCT OK, R/I FOR WHOLE BUILDING OK, PORTION NOT F COVERED AND CAN BE CHECKED ON FINAL
|
MEC97-00538
| INSP - Framing/ Rough-in | 3/5/1997 | 3/5/1997 | 3/5/1997 12:00:00 AM | P | PASS |
|
|
03/05/97 350 - R/I OK
|
MEC96-04000
| INSP - Final | 3/5/1997 | 3/5/1997 | 3/5/1997 12:00:00 AM | P | |
|
|
|
MEC96-04000
| INSP - Final | 3/5/1997 | 3/5/1997 | 3/5/1997 12:00:00 AM | P | |
|
|
|
BLD1054959
| INSP - Final | 3/4/1997 | 3/5/1997 | 3/5/1997 12:00:00 AM | P | PASS |
|
|
03/05/97 350 - FINAL
|
BLD96-02516
| INSP - Carpentry | 3/4/1997 | 3/5/1997 | 3/5/1997 12:00:00 AM | P | PASS |
|
|
03/05/97 350 - NAILING INSP. ASAP..... nailing of outside sheathing as per code and plans.
|