Inspections for the day of: Thursday, March 5, 1998.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC98-00728 INSP - Final3/5/19983/5/19983/6/1998 12:00:00 AMAPASS
03/05/98 407 -
MEC98-00728 INSP - Final3/5/19983/5/19983/6/1998 12:00:00 AMAPASS
03/05/98 407 -
MEC98-00736 INSP - Framing/ Rough-in3/4/19983/5/19983/6/1998 12:00:00 AMAPASS
03/05/98 407 - R/I AND PRESS--MERLE ###-####
BLD97-02883 INSP - Framing/Rough-in3/5/19983/5/19983/6/1998 12:00:00 AMPFAIL
03/05/98 407 - left corrections.DAVID ###-####
BLD98-00117 INSP - Framing/Rough-in3/5/19983/5/19983/5/1998 12:00:00 AM PASS
/ / 407 - re-insp,
BLD98-00414 INSP - Wall cover3/4/19983/5/19983/5/1998 12:00:00 AMANR
03/05/98 407 - not ready insulators not on job yet. [8955247].
BLD97-03171 INSP - Final3/4/19983/5/19983/5/1998 12:00:00 AMAFAIL
03/05/98 407 - told bob about my corrections.
BLD97-00943 INSP - Final3/4/19983/5/19983/5/1998 12:00:00 AMAPASS
03/05/98 407 - left corrections. 45 minutes before you go out
BLD98-00018 INSP - Framing/Rough-in3/4/19983/5/19983/5/1998 12:00:00 AMAFAIL
03/05/98 407 - left corrections. [3857310].
BLD97-03748 INSP - Framing/Rough-in3/5/19983/5/19983/5/1998 12:00:00 AMPPART
03/05/98 407 - shear nails, The framing contractor will add some additional fasteners in a few locations. Went over inspection with Bob from Marrs Co. and the framer.
MEC98-00740 INSP - Framing/ Rough-in3/5/19983/5/19983/5/1998 12:00:00 AMPFAIL
03/05/98 407 - left corrections.