Inspections for the day of: Monday, March 5, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03033 BLD-Framing/Rough-in3/2/20013/5/20013/5/2001 12:00:00 AMAPASS
###-#### 3/5/2001 11:59:37 AM ok toinsulate 3/5/2001 12:10:01 PM
BLD00-03401 BLD-Final3/2/20013/5/20013/5/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/02/2001 at 11:54:12. Contact: ###-####.
MEC01-00156 Final3/2/20013/5/20013/5/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/02/2001 at 14:14:48. Contact: ###-####.
BLD00-00880 BLD-Final3/2/20013/5/20013/5/2001 12:00:00 AMANR
Kay Nelson ###-#### please call before going out need mec and plp final 3/5/2001 12:10:33 PM
BLD01-00421 BLD-Foundation3/5/20013/5/20013/5/2001 12:00:00 AMPPART
###-#### poured with out inspection 3/5/2001 3:34:50 PM
MEC01-00286 Pressure Test3/5/20013/5/20013/5/2001 12:00:00 AMPPASS
GAS PIPING ###-####
MEC01-00626 Final3/2/20013/5/20013/5/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/02/2001 at 15:48:15. Contact: ###-####.
BLD00-03529 BLD-Framing/Rough-in3/2/20013/5/20013/5/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/02/2001 at 12:25:32. Contact: ###-####. c/n on site 3/5/2001 3:05:28 PM