MIS02-00037
| BLD-Final | 3/1/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | DONE |
|
|
Frances Jones ###-#### ele/hvac/bld required/form on site. 3/5/2002 4:00:32 PM
|
BLD01-01511
| BLD-Footing | 3/4/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 12:50:45. Contact: ###-####. ft for retaining wall at tower ok pending special insp report. 3/5/2002 10:47:04 AM
|
BLD01-02401
| BLD-Concrete | 3/4/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | PART |
|
|
###-#### SCOTT 8 ft lift rebar ok. 3/5/2002 10:59:48 AM
|
BLD01-01093
| BLD-Framing/Rough-in | 3/5/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | P | CANC |
|
|
ernie ###-#### fr
|
BLD01-03240
| BLD-Framing/Rough-in | 3/5/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | P | FAIL |
|
|
###-#### MIKE no plans on site. 3/5/2002 4:20:08 PM
|
BLD01-03197
| BLD-Conference | 3/5/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 301 On 3/5/2002 4:06:13 PM final ok pending ele and fire sign offs. 3/5/2002 4:14:25 PM
|
BLD01-03220
| BLD-Framing/Rough-in | 3/1/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | P | NR |
|
|
justin ###-#### sheer passed prviously. 3/5/2002 3:17:22 PM
|