BLD01-02188
| BLD-Conference | 3/4/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | PASS |
|
|
the cont. on the permit has not paid the fees for the permit and I see it is ready to expire. can you post a notice or what do you think we should do? thanks linda ###-#### work appears complete, re-bill roofer, I'd say. 3/5/2002 11:29:06 AM
|
BLD01-00234
| BLD-Final | 3/4/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | NR |
|
|
###-#### WENDELL FOR OCCUPANCY need fire, glass spec's, complete prior c/n 3/5/2002 11:30:53 AM
|
BLD01-02875
| BLD-Conference | 3/5/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 3/5/2002 9:00:32 AM w/ keith at site re fireblocking...draftstops
|
BLD00-03538
| BLD-Conference | 3/5/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 3/5/2002 9:34:52 AM W/ glazer, need specific info re fire sealant...send fax
|
BLD01-00234
| BLD-Final | 3/5/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 340 On 3/5/2002 11:30:00 AM wendell ###-####; c/n need fire, achd, stairs, firestops,rails, etc. 3/5/2002 5:48:18 PM
|
BLD01-00379
| BLD-Conference | 3/5/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 340 On 3/5/2002 1:50:25 PM w/ bldr, sent insp to 408 3/5/2002 2:50:45 PM
|
MIS02-00023
| BLD-Conference | 3/5/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 3/5/2002 5:50:45 PM rec'd report re excavation from mti.
|
BLD01-03163
| BLD-Framing/Rough-in | 3/5/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | P | NR |
|
|
JUSTIN ###-#### ( MASON )
|
BLD01-00512
| BLD-Final | 3/5/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/05/2002 at 09:12:43. Contact: ###-####...need fire. 3/6/2002 1:29:19 PM
|