Inspections for the day of: Tuesday, March 5, 2002.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00736 BLD-Framing/Rough-in3/4/20023/5/20023/5/2002 12:00:00 AMAPART
clay ###-#### ok to cover 2nd floor rest room ceiling from the east wall to elevator. 3/5/2002 3:35:34 PM
BLD01-02798 BLD-Framing/Rough-in3/4/20023/5/20023/5/2002 12:00:00 AMAPART
partial fr -jeff- cell ###-#### insulate above the glass walls ok. Note: 3rd Resubmital has not yet been approved. 3/5/2002 11:43:47 AM
BLD01-02064 BLD-Final2/28/20023/5/20023/5/2002 12:00:00 AMANR
###-####
MIS02-00034 BLD-Final2/28/20023/5/20023/5/2002 12:00:00 AMADONE
sharon jones ###-####. Ok left foarm. 3/5/2002 10:46:38 AM
BLD00-01498 BLD-Final3/4/20023/5/20023/5/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 03/04/2002 at 14:31:04. Contact: ###-####.needs fire/lifesafety before callibg for a final. 3/5/2002 4:31:50 PM
BLD01-03065 BLD-Final3/5/20023/5/20023/5/2002 12:00:00 AMPFAIL
###-#### DREW CALL 1ST SO HE CAN MEET YOU Need handrail at new revised stair top step exceeds 8 in, also need smoke dewt in basement. 3/5/2002 4:30:49 PM
BLD01-02064 BLD-Final3/5/20023/5/20023/5/2002 12:00:00 AMPFAIL
Scheduled by Inspector: 407 On 3/5/2002 10:59:43 AM Needs all other required sign before calling for final. 3/5/2002 4:31:25 PM
MEC01-03540 Final3/5/20023/5/20023/5/2002 12:00:00 AMPPASS
Scheduled by Inspector: 407 On 3/5/2002 4:29:13 PM