BLD01-02822
| BLD-Wall cover | 3/4/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 12:27:31. Contact: ###-####. ok to cover needs letter from eng for change to gyp shear for some int walls instead of osb 3/5/2002 11:39:58 AM
|
BLD02-00413
| BLD-Foundation | 3/4/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | PART |
|
|
found- dan ###-#### wip hds not set in place 3/5/2002 9:08:55 AM
|
BLD01-02005
| BLD-Final | 3/4/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 13:09:51. Contact: ###-####. ok to move into new area 3/5/2002 11:08:01 AM
|
BLD01-02096
| BLD-Final | 3/4/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | FAIL |
|
|
###-#### DAVE smoke det required in bedrooms then ok for final 3/5/2002 9:32:44 AM
|
BLD01-01879
| BLD-Energy code compliance | 3/4/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD99-03216
| BLD-Footing | 3/4/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | PASS |
|
|
###-#### GEORGE pending spec insp 3/4/2002 5:19:44 PM
|
MEC02-00606
| Final | 3/4/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 22:20:03. Contact: ###-####.
|
BLD02-00413
| BLD-Footing | 3/1/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | PART |
|
|
tony... dan ###-#### has a hard time hearing / understanding done by 340 3/5/2002 9:09:12 AM
|
BLD01-03084
| BLD-Final | 3/4/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 07:03:25. Contact: ###-####. incomplete c/notice 3/5/2002 3:31:20 PM
|
BLD01-02680
| BLD-Final | 3/5/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | P | NR |
|
|
steve- ###-#### fn gar code is 0000 not even close for a final insp 3/5/2002 3:19:48 PM
|
BLD01-00863
| BLD-Footing | 3/5/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | P | PART |
|
|
per tom for ft - wip 3/5/2002 4:14:27 PM
|
BLD01-01302
| BLD-Final | 3/4/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | P | NH |
|
|
MARK ###-#### no answer on phone no one home 3/5/2002 1:52:48 PM
|
BLD01-00379
| BLD-Framing/Rough-in | 3/4/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | P | PASS |
|
|
fr chris ###-####
|