Inspections for the day of: Tuesday, March 5, 2002.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02924 BLD-Final3/4/20023/5/20023/5/2002 12:00:00 AMAPASS
###-#### PATTI
BLD02-00407 BLD-Footing3/4/20023/5/20023/5/2002 12:00:00 AMAPART
###-#### PAUL JOHN ###-####
BLD02-00239 BLD-Framing/Rough-in3/4/20023/5/20023/5/2002 12:00:00 AMAPASS
###-#### STEVE LOCK BOX # ON IRON RAIL ON HOUSE IS 3096
ok to cover 3/5/2002 11:29:07 AM
BLD00-03204 BLD-Conference3/4/20023/5/20023/5/2002 12:00:00 AMAPART
###-#### TOM ###-####
ok for alt. hds/shear per new engineering 3/6/2002 2:18:25 PM
BLD00-03207 BLD-Conference3/4/20023/5/20023/5/2002 12:00:00 AMAPART
###-#### TOM ###-####
new engineering ok on hds/shear 3/6/2002 2:20:02 PM
BLD00-03208 BLD-Conference3/4/20023/5/20023/5/2002 12:00:00 AMAPART
###-#### TOM ###-####
conf. on changing hds and shear per new engineering///will review, looks ok so far 3/5/2002 9:58:17 AM
BLD01-02930 BLD-Energy code compliance3/4/20023/5/20023/5/2002 12:00:00 AMAPASS
###-####
BLD01-03232 BLD-Framing/Rough-in3/5/20023/5/20023/5/2002 12:00:00 AMPPART
###-#### TRENTON
c/n posted,, ok to insulate 3/5/2002 3:35:09 PM
MEC01-03111 Conference3/5/20023/5/20023/5/2002 12:00:00 AMPPASS
final ok 3/5/2002 3:45:21 PM
BLD01-02922 BLD-Framing/Rough-in3/4/20023/5/20023/5/2002 12:00:00 AMPPART
###-#### SHANE
c/n posted,, ok to insulate pending trades 3/5/2002 3:37:26 PM
BLD02-00203 BLD-Framing/Rough-in3/1/20023/5/20023/5/2002 12:00:00 AMPCANC
brett ###-####--per brett cancel
BLD01-02888 BLD-Foundation3/4/20023/5/20023/5/2002 12:00:00 AMPPART
found wall- pat-###-####
3/6/2002 10:05:31 AM
BLD01-02788 BLD-Footing3/4/20023/5/20023/5/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/04/2002 at 13:51:49. Contact: ###-####.
west part of ftgs ok, pending soil report 3/5/2002 3:47:41 PM