MIS02-00035
| BLD-Final | 2/28/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | PASS |
|
|
CAROL ###-####
|
BLD01-02678
| BLD-Final | 3/1/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | FAIL |
|
|
###-#### code for the garage 0000enter c/n on site 3/5/2002 10:22:13 AM
|
BLD01-02240
| BLD-Other | 3/4/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 09:09:34. Contact: ###-####. roof decking welding left note for special inspector to check several areas no respection as long as sp insp signs off 3/5/2002 1:22:28 PM
|
BLD02-00423
| BLD-Foundation | 3/4/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | PASS |
|
|
###-#### bob
|
MEC02-00565
| Final | 3/4/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | FAIL |
|
|
fn insp for homeowner -mike ###-#### call 1st before insp c/n on site 3/5/2002 12:42:37 PM
|
BLD01-03134
| BLD-Framing/Rough-in | 3/4/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | A | PASS |
|
|
###-#### ok to insulate 3/5/2002 10:56:57 AM
|
BLD01-03183
| BLD-Framing/Rough-in | 3/5/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | P | FAIL |
|
|
chris- ###-#### fr c/n on site do not insulate until seal package has been inspected 3/5/2002 2:13:31 PM
|
BLD00-00663
| BLD-Final | 3/5/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-03507
| BLD-Final | 3/4/2002 | 3/5/2002 | 3/5/2002 12:00:00 AM | P | NH |
|
|
MARK ###-#### still needs plumbing final 3/5/2002 2:43:45 PM
|