Inspections for the day of: Tuesday, March 5, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS02-00035 BLD-Final2/28/20023/5/20023/5/2002 12:00:00 AMAPASS
CAROL ###-####
BLD01-02678 BLD-Final3/1/20023/5/20023/5/2002 12:00:00 AMAFAIL
###-#### code for the garage 0000enter c/n on site 3/5/2002 10:22:13 AM
BLD01-02240 BLD-Other3/4/20023/5/20023/5/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 03/04/2002 at 09:09:34. Contact: ###-####. roof decking welding left note for special inspector to check several areas no respection as long as sp insp signs off 3/5/2002 1:22:28 PM
BLD02-00423 BLD-Foundation3/4/20023/5/20023/5/2002 12:00:00 AMAPASS
###-#### bob
MEC02-00565 Final3/4/20023/5/20023/5/2002 12:00:00 AMAFAIL
fn insp for homeowner -mike ###-#### call 1st before insp c/n on site 3/5/2002 12:42:37 PM
BLD01-03134 BLD-Framing/Rough-in3/4/20023/5/20023/5/2002 12:00:00 AMAPASS
###-#### ok to insulate 3/5/2002 10:56:57 AM
BLD01-03183 BLD-Framing/Rough-in3/5/20023/5/20023/5/2002 12:00:00 AMPFAIL
chris- ###-#### fr c/n on site do not insulate until seal package has been inspected 3/5/2002 2:13:31 PM
BLD00-00663 BLD-Final3/5/20023/5/20023/5/2002 12:00:00 AMPPASS
###-####
BLD00-03507 BLD-Final3/4/20023/5/20023/5/2002 12:00:00 AMPNH
MARK ###-#### still needs plumbing final 3/5/2002 2:43:45 PM