BLD00-02671
| BLD-Aging Inspection | 3/5/2003 | 3/5/2003 | 3/5/2003 12:00:00 AM | | DONE |
|
|
tenant moved out, expire 3/6/2003 1:42:15 PM
|
BLD01-01345
| BLD-Final | 3/4/2003 | 3/5/2003 | 3/5/2003 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 3/4/2003 at 2:00:48 PM. Contact: ###-####...need verify gas storage final as per permit req's 3/5/2003 4:05:41 PM
|
BLD02-02634
| BLD-Framing/Rough-in | 3/4/2003 | 3/5/2003 | 3/5/2003 12:00:00 AM | A | FAIL |
|
|
CLINT; Phone #: ###-#### Internet Inspection Request from: Annette Moore...c/n: air seal, fireblocks...ok to insul 3/5/2003 10:48:38 AM
|
MEC02-03680
| Rough-in | 3/4/2003 | 3/5/2003 | 3/5/2003 12:00:00 AM | A | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen...resched for pm 3/5/2003 3:49:53 PM
|
MEC02-03680
| Pressure Test | 3/4/2003 | 3/5/2003 | 3/5/2003 12:00:00 AM | A | CANC |
|
|
3 gas tests holding. 2 low pressures at furnaces in "basement" 1 high pressure in the same area.
Thanks
Carol; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen
|
BLD02-00199
| BLD-Concrete | 3/4/2003 | 3/5/2003 | 3/5/2003 12:00:00 AM | A | PART |
|
|
wip, pend insp reports...deck. 3/5/2003 5:40:22 PM
|
BLD02-02772
| BLD-Final | 3/4/2003 | 3/5/2003 | 3/5/2003 12:00:00 AM | A | NR |
|
|
MIKAYLA; Phone #: ###-#### Internet Inspection Request from: Darla Downs...need fire 1st 3/5/2003 9:19:10 AM
|
BLD02-02772
| BLD-Final | 3/4/2003 | 3/5/2003 | 3/5/2003 12:00:00 AM | P | PART |
|
|
MIKAYLA; Phone #: ###-#### Internet Inspection Request from: Darla Downs...fix exit sign & hdwe at North( 2nd) exit...access. counter? 3/5/2003 5:24:35 PM
|
BLD02-02446
| BLD-Framing/Rough-in | 3/5/2003 | 3/5/2003 | 3/5/2003 12:00:00 AM | P | CANC |
|
|
DIRK ###-#### SHOP #; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD02-02446
| BLD-Energy code compliance | 3/5/2003 | 3/5/2003 | 3/5/2003 12:00:00 AM | P | CANC |
|
|
DIRK ###-#### SHOP #; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD02-02815
| BLD-Framing/Rough-in | 3/5/2003 | 3/5/2003 | 3/5/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 3/5/2003 at 10:21:37 AM. Contact: ###-####.
|
BLD02-00199
| BLD-Concrete | 3/5/2003 | 3/5/2003 | 3/5/2003 12:00:00 AM | P | NR |
|
|
need conf re apts 3/5/2003 6:03:20 PM
|
BLD02-02446
| BLD-Energy code compliance | 3/5/2003 | 3/5/2003 | 3/5/2003 12:00:00 AM | P | CANC |
|
|
call 1st ###-####, dirk
|