Inspections for the day of: Wednesday, March 5, 2003.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01155 BLD-Footing3/4/20033/5/20033/5/2003 12:00:00 AMAPART
###-####
BLD02-01556 BLD-Framing/Rough-in3/4/20033/5/20033/5/2003 12:00:00 AMACANC
###-#### RANDY ###-#### TR OY SHEAR marlene called to canc this inspection
BLD02-01557 BLD-Framing/Rough-in3/4/20033/5/20033/5/2003 12:00:00 AMACANC
###-#### RANDY ###-#### TROY SHEAR marlene called to canc this inspection not ready
MEC02-01782 Conference3/4/20033/5/20033/5/2003 12:00:00 AMPPASS
###-#### SHAWNA EXTENTION ONLY
BLD02-02599 BLD-Framing/Rough-in3/5/20033/5/20033/5/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 3/5/2003 at 6:42:55 AM. Contact: ###-####.
c/n on shear, no reg frame inspection, need trades 1st 3/5/2003 4:25:16 PM
BLD02-02981 BLD-Framing/Rough-in3/5/20033/5/20033/5/2003 12:00:00 AMPFAIL
###-####
c/n posted, ok to insulate 3/5/2003 3:45:19 PM
BLD02-02778 BLD-Framing/Rough-in3/5/20033/5/20033/5/2003 12:00:00 AMPCANC
###-#### shear
re-scheduled 3/6/2003 3:46:48 PM
BLD02-02123 BLD-Energy code compliance3/5/20033/5/20033/5/2003 12:00:00 AMPPART
DAMON; Phone #: ###-#### Internet Inspection Request from: Darla Downs
ok to cover part only, not fire place due to changes being made w/ new tv shelf,, also need int shear insp. 3/5/2003 4:24:00 PM
BLD02-01557 BLD-Conference3/5/20033/5/20033/5/2003 12:00:00 AMPCANC
shear conference
BLD02-01556 BLD-Conference3/5/20033/5/20033/5/2003 12:00:00 AMPCANC
shear conference