MIS02-00010
| MIS-Aging Inspection | 3/5/2003 | 3/5/2003 | 3/5/2003 12:00:00 AM | | NR |
|
|
Work in progress with the alarm system 3/12/2003 8:52:17 AM
|
FIR01-00272
| INSP-Conference | 3/5/2003 | 3/5/2003 | 3/5/2003 12:00:00 AM | A | DONE |
|
|
I spoke with Nicole with mountain alarm. She will follow up to see if the correct batteries have been installed so the permit can be finaled
|
BLD02-01073
| FIRE-Conference | 3/4/2003 | 3/5/2003 | 3/5/2003 12:00:00 AM | A | DONE |
|
|
Phone #: ###-#### I spoke to the contractor about on site fire protection. The last fire hydrant was being installed today. All roads accessing the job site would be finished by next week as well as all fire hydrants being operational. Building supplies are to begin arriving the end of next week 3/5/2003 9:36:54 AM
|
BLD01-01557
| FIRE-Final Inspection | 3/4/2003 | 3/5/2003 | 3/5/2003 12:00:00 AM | A | FAIL |
|
|
provide city approved plans for inspection 3/7/2003 12:26:50 PM
|
BLD99-02651
| FIRE-Final Inspection | 3/4/2003 | 3/5/2003 | 3/5/2003 12:00:00 AM | P | PASS |
|
|
STEVE; Phone #: ###-#### Fire life safety finaled 3/5/2003 3:26:39 PM
|
FIR00-00452
| INSP-Final Inspection | 3/5/2003 | 3/5/2003 | 3/5/2003 12:00:00 AM | P | PASS |
|
|
items on the correction notice dated 12/12/00 have been corrected. Fire alarm system finaled
|