PLM04-00471
| Water and/or Sewer | 3/4/2004 | 3/5/2004 | 3/5/2004 12:00:00 AM | A | PASS |
|
|
shawn; Phone #: ###-#### Internet Inspection Request from: Darla Downs hook up to existing services final ok 3/5/2004 8:53:10 AM
|
PLM03-03796
| Plumbing Rough-in | 3/4/2004 | 3/5/2004 | 3/5/2004 12:00:00 AM | A | PASS |
|
|
10:00 ri ok 3/5/2004 10:22:04 AM
|
PLM03-03821
| Final | 3/4/2004 | 3/5/2004 | 3/5/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 3/4/2004 at 2:26:53 PM. Contact: ###-####. final ok with rp drain over a 2" hub drain off washer box. 3/5/2004 9:15:38 AM
|
PLM03-03949
| Final | 3/5/2004 | 3/5/2004 | 3/5/2004 12:00:00 AM | A | FAIL |
|
|
hold temp occ untill Avalon landscape gets their sprinkler permit.
|
PLM04-00492
| Sprinkler (Final) | 3/5/2004 | 3/5/2004 | 3/5/2004 12:00:00 AM | P | PASS |
|
|
heather; Phone #: ###-#### Internet Inspection Request from: Darla Downs sp final ok 3/5/2004 1:52:44 PM
|
PLM03-03949
| Final | 3/5/2004 | 3/5/2004 | 3/5/2004 12:00:00 AM | P | PART |
|
|
got the sprinkler permit, temp occ ok.
|
PLM03-02034
| Final | 3/2/2004 | 3/5/2004 | 3/5/2004 12:00:00 AM | P | PASS |
|
|
###-#### thomas ready at 3:00pm final ok 3/5/2004 3:36:26 PM
|
PLM04-00490
| Plumbing Rough-in | 3/5/2004 | 3/5/2004 | 3/5/2004 12:00:00 AM | P | PASS |
|
|
graig; Phone #: ###-#### Internet Inspection Request from: Darla Downs ri ok 3/5/2004 1:36:28 PM
|