Inspections for the day of: Friday, March 5, 2004.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC04-00149 Site Preparation3/2/20043/5/20043/5/2004 12:00:00 AMADONE
Conference: Informed GC--Gary that prior to construction all bmp's per plan are required. Will perform inspection as needed. 3/5/2004 8:27:38 AM
ESC02-00862 Site Preparation3/3/20043/5/20043/5/2004 12:00:00 AMAFAIL
C/N posted: Informed GC and left message for rp. Complete by the end of the weekend 93/7/04 or a stop work can be issued. 3/5/2004 8:06:47 AM
ESC02-00900 BMP Violation3/4/20043/5/20043/5/2004 12:00:00 AMAPART
John Wyman ###-####: Sweeping job not acceptable; only (1) drop inlet protected. Left voice message to GC to complete job acceptable. Will follow up. 3/5/2004 2:33:09 PM
ESC03-00962 BMP Violation3/4/20043/5/20043/5/2004 12:00:00 AMAPART
Entrances into construction are barricaded until conditions are ok to install construction entrances. 3/5/2004 1:37:50 PM
ESC03-00927 Site Preparation3/4/20043/5/20043/5/2004 12:00:00 AMAPASS
ESC03-01570 Site Preparation3/5/20043/5/20043/5/2004 12:00:00 AMPPASS
ESC03-01126 BMP Violation3/5/20043/5/20043/5/2004 12:00:00 AMPFAIL
Informed rp to remove gravel, dirt from sidewalk and street. D. I. needs protection that will stop sediment from entering, in-correct protection at present. Will follow up. 3/5/2004 2:22:53 PM
ESC03-00715 Site Preparation3/5/20043/5/20043/5/2004 12:00:00 AMPPASS