Inspections for the day of: Friday, March 5, 2004.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00084 INSP-Sprinkler Rough-in/Hydro3/4/20043/5/20043/5/2004 12:00:00 AMAPASS
sprinkler piping is ok to cover. At final three areas need to be reverified for work completed. See approved plans for locations. 3/5/2004 9:33:05 AM
FIR03-00558 INSP-Sprinkler Rough-in/Hydro3/4/20043/5/20043/5/2004 12:00:00 AMAFAIL
Consult room 100 not complete yet 3/5/2004 11:10:17 AM
BLD03-02312 FIRE-Final Inspection3/4/20043/5/20043/5/2004 12:00:00 AMAPASS
life safety finaled 3/5/2004 9:17:18 AM
FIR04-00124 INSP-Sprinkler Rough-in/Hydro3/5/20043/5/20043/5/2004 12:00:00 AMPFAIL
No approved plans on site. Piping to the sprinkler pendant needs a hanger to provide support 3/5/2004 1:53:33 PM
FIR04-00079 INSP-Sprinkler Rough-in3/5/20043/5/20043/5/2004 12:00:00 AMPPART
Underground supply line is ok to cover 3/5/2004 3:03:33 PM
BLD03-02533 BLD-Conference3/5/20043/5/20043/5/2004 12:00:00 AMPDONE
I met with the door hardware contractor to discuss which doors needed which hardware 3/5/2004 3:57:48 PM
FIR04-00151 INSP-Conference3/5/20043/5/20043/5/2004 12:00:00 AMPDONE
I stopped at the project to do an underground inspection and saw the fire alarm panel mounted in the entry lobby of the building. I sent an e-mail to Mary
FIR04-00151 INSP-Conference3/5/20043/5/20043/5/2004 12:00:00 AMPDONE
I stopped at the project to do an underground inspection and saw the fire alarm panel mounted in the entry lobby of the building. I sent an e-mail to Mary