FIR08-00321
| INSP-Alarm Testing | 3/5/2009 | 3/5/2009 | 3/5/2009 4:55:33 PM | P | DEFR |
|
|
See previous correction notice for list of items remaining.
|
FIR08-00737
| INSP-Sprinkler Rough-in/Hydro | 3/5/2009 | 3/5/2009 | 3/5/2009 4:54:21 PM | P | NR |
|
|
Don Phone#: ###-#### Not ready per phone call from contractor
|
FIR08-00858
| INSP-Sprinkler Rough-in | 3/5/2009 | 3/5/2009 | 3/5/2009 4:53:45 PM | P | PART |
|
|
Okay to cover with exceptions noted at the file/copy room and the breakroom, including overspaced heads at the breakroom and one additonal head required at the file room, also noted one existing ssu at the deck to be removed, see plans for locations.
|
BLD08-02358
| FIRE-Final Inspection | 3/5/2009 | 3/5/2009 | 3/5/2009 4:29:03 PM | P | PASS |
|
|
Fire life safety final inspection passed.
|
FIR08-00018
| INSP-Sprinkler Rough-in/Hydro | 3/2/2009 | 3/5/2009 | 3/5/2009 4:28:06 PM | A | FAIL |
|
|
Overhead rough-in inspection for the 14th floor failed due to items marked on plan set including one blocked upright head, four intermediate temp. heads to be replaced, common corridor not yet completed.
|
BLD07-01654
| FIRE-Conference | 3/5/2009 | 3/5/2009 | 3/5/2009 4:24:43 PM | A | DONE |
|
|
Regarding project related FIR permits and final fire life safety inspection.
|
FIR08-00460
| INSP-Final Inspection | 3/3/2009 | 3/5/2009 | 3/5/2009 4:23:44 PM | A | PASS |
|
|
Noted correction items verified for completion, final fire alarm testing passed, permit finaled.
|