Inspections for the day of: Thursday, March 5, 2009.
Number of inspections: 9
Percentage of inspections complete: 89 %
Percentage of inspections not complete: 11 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-02412 BLD-Final2/27/20093/2/2009 P 
BLD08-01479 BLD-Final3/4/20093/5/20093/10/2009 1:18:29 PMANR
Scheduled by a contractor via Hello! on 3/4/2009 at 9:32:25 AM. Contact: ###-####.needs fire finals first
BLD08-02178 BLD-Final3/5/20093/5/20093/5/2009 4:10:50 PMPPASS
buzz Phone #: ###-#### note this project was scaled back to a kitchen and bath remodel no second floor no new window no changes to ext
BLD08-02178 DOC - Permit Finaled3/5/20093/5/20093/5/2009 4:08:45 PMPPASS
BLD08-02328 BLD-Final3/5/20093/5/20093/5/2009 3:51:32 PMPFAIL
Scheduled by a contractor via Hello! on 3/5/2009 at 9:31:21 AM. Contact: ###-####. needs to post address and tempered window up stairs master bath
BLD09-00222 BLD-Conference3/5/20093/5/20093/5/2009 3:50:17 PMPPASS
Rory Phone #: ###-####,, verify mech pass so that they can finish covering
BLD07-01654 BLD-Final3/3/20093/5/20093/5/2009 1:06:20 PMAPART
jim Phone #: ###-#### ok for temp occ after fire life safty final needs to finish landscaping
BLD06-02303 BLD-Final3/3/20093/5/20093/5/2009 1:05:11 PMAPART
Brad Phone #: ###-#### corradors floors 9,10,and 11 ok to cover ceilings
BLD09-00213 BLD-Foundation3/5/20093/5/20093/5/2009 1:03:42 PMPPASS
Brett Phone #: ###-####