BLD08-02384
| FIRE-Final Inspection | 3/4/2009 | 3/5/2009 | 3/5/2009 3:51:06 PM | P | PASS |
|
|
life safety passed
|
FIR09-00018
| INSP-Final Inspection | 3/5/2009 | 3/5/2009 | 3/5/2009 2:54:11 PM | P | PASS |
|
|
Permit finaled
|
FIR08-00491
| INSP-Final Inspection | 3/4/2009 | 3/5/2009 | 3/5/2009 2:52:58 PM | A | FAIL |
|
|
This permit will be ok to final when the fire alarm interconnects have been verified.
|
BLD08-01321
| FIRE-Final Inspection | 3/4/2009 | 3/5/2009 | 3/5/2009 2:51:37 PM | A | FAIL |
|
|
The project related fire alarm permit needs to be finaled. Mount the occupant load signs, provide signage on the riser room and facp rooms as discussed. Provide exit discharge light at the main exit.
|
FIR08-00788
| INSP-Final Inspection | 3/4/2009 | 3/5/2009 | 3/5/2009 2:50:10 PM | A | FAIL |
|
|
The strobes in the BreakRoom and the Mens Locker Room did not work. The strobes in Corridor 138C did not sync. The strobes in the Women's locker room need to be sync'd or a hydraulic closer installed on the door as discussed. The fire/smoke dampers need inspected.
|
FIR08-00672
| INSP-Final Inspection | 3/4/2009 | 3/5/2009 | 3/5/2009 2:27:58 PM | A | PASS |
|
|
Permit finaled.
|
FIR08-00616
| INSP-Sprinkler Rough-in/Hydro | 3/5/2009 | 3/5/2009 | 3/5/2009 2:27:12 PM | A | PASS |
|
|
The remaining sprinkler piping is ok to cover.
|
FIR08-00688
| INSP-Final Inspection | 3/4/2009 | 3/5/2009 | 3/5/2009 1:26:03 PM | A | FAIL |
|
|
Provide as-builts showing the relocated smoke detectors, relocated NAC panel and the facp interconnection with the hvac shutdown.
|