BLD09-01625
| FIRE-Final Inspection | 3/5/2010 | 3/5/2010 | 3/5/2010 5:02:30 PM | P | PASS |
|
|
Items on previous correction notice are finished, life safety final passed. Discussed final inspections needed for electrical and structural divisions with the contractor on site.
|
FIR09-00588
| INSP-Final Inspection | 3/4/2010 | 3/5/2010 | 3/5/2010 5:00:01 PM | A | PASS |
|
|
Correction items verified for completion, as-built plan accepted, fire alarm permit finaled.
|
FIR09-00540
| INSP-Sprinkler Rough-in | 3/3/2010 | 3/5/2010 | 3/5/2010 4:59:04 PM | A | PART |
|
|
Overhead fire sprinkler work at the grid ceilings throughout are approved for cover.
|
FIR09-00669
| INSP-Sprinkler Rough-in | 3/4/2010 | 3/5/2010 | 3/5/2010 4:57:28 PM | A | PART |
|
|
Overhead modifications at the 1st floor remodel are okay for cover.
|
FIR10-00091
| INSP-Sprinkler Rough-in | 3/4/2010 | 3/5/2010 | 3/5/2010 4:56:11 PM | A | PART |
|
|
Overhead rough-in approved for cover, final pending ceiling install at the equipment booth and tile in the grid ceilings.
|
FIR10-00041
| INSP-Final Inspection | 3/4/2010 | 3/5/2010 | 3/5/2010 4:53:31 PM | A | PASS |
|
|
Fire sprinkler permit okayed for final.
|
FIR10-00056
| INSP-Final Inspection | 3/4/2010 | 3/5/2010 | 3/5/2010 4:52:34 PM | A | PASS |
|
|
Fire sprinkler permit work approved for final.
|
BLD10-00171
| FIRE-Final Inspection | 3/5/2010 | 3/5/2010 | 3/5/2010 11:24:38 AM | P | CANC |
|
|
late pm please//Chris Phone #: ###-#### Inspection cancelled from web by: Rita DeYoung
|
BLD09-02013
| FIRE-Final Inspection | 3/5/2010 | 3/5/2010 | 3/5/2010 11:20:37 AM | P | CANC |
|
|
late pm please//Chris Phone #: ###-#### Inspection cancelled from web by: Rita DeYoung
|
FIR09-00669
| INSP-Sprinkler Rough-in/Hydro | 3/4/2010 | 3/5/2010 | 3/5/2010 12:00:00 AM | A | CANC |
|
|
don Phone #: ###-####
|