Inspections for the day of: Friday, March 5, 2010.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-00967 Aging Inspection3/5/20103/5/20103/5/2010 4:03:54 PM DONE
ESC06-00967 DOC - Permit Finaled3/5/20103/5/20103/5/2010 4:03:44 PMPPASS
ESC09-00377 Random Inspection3/5/20103/5/20103/5/2010 3:47:32 PMPPART
Verbal to RP:
Sweep up all hard surfaces. Will re-inspect on 3/8/10PM.
ESC09-00537 DOC - Permit Finaled3/5/20103/5/20103/5/2010 3:46:36 PMPPASS
ESC10-00129 Site Preparation2/26/20103/5/20103/5/2010 3:01:43 PMAPART
Sign posted but no activity has occured yet.
ESC09-00812 General Inspection3/5/20103/5/20103/5/2010 1:41:28 PMPFAIL
Verbal to RP:
Maintenance needs to occur on the channel liner due to the exposed areas of the channel. RP has informed me that they do not want to shut the pumps down and see if there is an issue thats need to be corrected by turbid discharge into the ponds or sand creek. I Explained that perventive maintenance is how the maintenance shouuld occur. Not fixing when an actual issue occurs. Will re-inspect on 3/8/10 am to see if perventive maintenance occured.
ESC09-00725 Site Preparation3/1/20103/5/20103/5/2010 10:33:14 AMANR
ESC10-00157 Site Preparation ESC3/5/20103/5/20103/5/2010 10:22:22 AM NR
ESC09-00021 BMP Violation3/5/20103/5/20103/5/2010 10:10:44 AMPFAIL
Message to RP:
Protect storm drain inlet to the east of parking lot. Remove or protect stock piles with a sediment barrier along the down hill spole of the parking lot. Will re-inspect on 3/8/10 am.
ESC10-00102 Site Preparation3/5/20103/5/20103/5/2010 9:07:41 AM PASS
ESC10-00161 Site Preparation ESC3/5/20103/5/20103/5/2010 8:58:10 AM NR
ESC10-00160 Site Preparation3/5/20103/5/20103/5/2010 8:52:47 AM NR