ESC11-00834
| General Inspection | 2/29/2012 | 2/29/2012 | | | |
|
|
|
BLD11-02974
| BLD-Framing/Rough-in | 3/5/2012 | 3/5/2012 | 3/5/2012 5:00:51 PM | P | PART |
|
|
CHRIS Phone #: ###-####. 5/8 type x rock attachment for 1hr. fire walls.
|
ESC12-00081
| Random Inspection | 3/5/2012 | 3/5/2012 | 3/5/2012 3:56:11 PM | P | PASS |
|
|
|
BLD12-00102
| BLD-Framing/Rough-in | 3/5/2012 | 3/5/2012 | 3/5/2012 2:15:00 PM | P | PASS |
|
|
Please call prior to inspection- will meet to walk through the building. Dave Minegar ###-#### Phone #: ###-#### >> Inspection requested via web by nate hutton. Interior steel walls for office cubes.
|
BLD12-00293
| BLD-Framing/Rough-in | 3/5/2012 | 3/5/2012 | 3/5/2012 1:49:05 PM | P | PASS |
|
|
darren Phone #: ###-####. Interior steel stud walls only.
|
BLD11-00285
| BLD-Final | 3/5/2012 | 3/5/2012 | 3/5/2012 1:48:29 PM | P | NR |
|
|
Phone #: ###-#### >> Inspection requested via web by Scott Zierler
|
BLD11-00286
| BLD-Final | 3/2/2012 | 3/5/2012 | 3/5/2012 1:19:10 PM | P | CANC |
|
|
Please call for access and onsite visit.
Thank you. Phone #: ###-#### >> Inspection requested via web by Scott Zierler Inspection cancelled from web by: Scott Zierler
|
GCB12-00013
| GCB-Fndatn/slab ins/fld vent | 3/2/2012 | 3/5/2012 | 3/5/2012 11:03:36 AM | A | PART |
|
|
Ian @ ###-####
|
ESC11-00890
| Random Inspection | 3/5/2012 | 3/5/2012 | 3/5/2012 10:45:43 AM | A | PASS |
|
|
|
GCB11-00092
| GCB-Final | 3/2/2012 | 3/5/2012 | 3/5/2012 10:39:10 AM | A | FAIL |
|
|
Scott @ ###-####. Provide and post blower door test results and post the required energy cert. Correction notice was posted.
|
BLD11-02979
| BLD-Energy code compliance | 3/2/2012 | 3/5/2012 | 3/5/2012 9:32:02 AM | A | PASS |
|
|
Jason Phone #: ###-####
|
BLD11-02979
| BLD-Framing/Rough-in | 3/5/2012 | 3/5/2012 | 3/5/2012 9:31:23 AM | A | PASS |
|
|
Jason Phone #: ###-####
|