Inspections for the day of: Wednesday, March 5, 2014.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00193 Stop Work Order3/5/20143/5/20143/7/2014 7:46:36 AMADONE
NOTE: This entry is to show that SWO was issued 12/4/2013. Site will be re-inspected today, 3/5/2014. This is for tracking purposes only, no current status change to the SWO in effect.
ESC13-00344 General Inspection3/5/20143/5/20143/5/2014 5:00:01 PM CANC
ESC13-01151 General Inspection3/5/20143/5/20143/5/2014 4:53:46 PM CANC
ESC13-01148 General Inspection3/5/20143/5/20143/5/2014 4:48:49 PM CANC
ESC13-00440 Aging Inspection3/5/20143/5/20143/5/2014 4:44:25 PM PASS
Finaled.
ESC13-01167 Site Preparation3/4/20143/5/20143/5/2014 4:42:16 PMAPEND
No construction yet, but observed surveying and stakes being placed during another inspection. Want to ensure they do a site prep. Check with RP on status.

Called RP to check status. Awaiting a return call. Unable to visit site today, this inspection was requested by me as a reminder to myself.
ESC13-00440 DOC - Permit Finaled3/5/20143/5/20143/5/2014 4:38:49 PMPPASS
BLD already finaled. ESC conditions satisfied.
ESC13-00144 General Inspection3/5/20143/5/20143/5/2014 4:28:36 PM PASS
No new activity. Still awaiting stabilization in some areas as discussed with Boise PW.
ESC13-01110 Site Preparation3/5/20143/5/20143/5/2014 4:18:59 PMPPASS
ESC13-01243 Site Preparation3/5/20143/5/20143/5/2014 4:09:19 PMPPART
Phone #: ###-#### >> Inspection requested via web by Austin Wagner

This site is ready but the washout needs maintenance before further foundation work begins. Will check back tomorrow.
ESC13-01253 Site Preparation3/5/20143/5/20143/5/2014 4:07:31 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Austin Wagner

Permit posted. BMP along downslope is silt fence and shall remai installed. Approved.
ESC13-00193 General Inspection3/4/20143/5/20143/5/2014 2:33:29 PMPPEND
call before to meet // cameron Phone #: ###-####

Onsite meeting and walk through with Cameron Jayo and Jerry Wright (Wright Construction) who will be complete the remainder of the subdivision development.

Jayo's ESC crew will provide additional silt fencing between existing fence(to be removed) and the stormwater pond, as well as area between Somerset #3 and Somerset Village.

Wright construction will make earthen berm at the end of the graded/in-fill area.

SWO is still in effect until these ESC corrections are made. Plan is to have site completed and ready for construction on Monday 3/10/2014. Jerry is to call Evan or myself.

Alerted Cameron Jayo about the re-inspection fee applied to the permit which must be paid for SWO to be lifted.
ESC13-00854 General Inspection3/5/20143/5/20143/5/2014 10:50:48 AM PASS
ESC13-00710 General Inspection3/4/20143/5/20143/5/2014 10:46:03 AMAPASS
rescheduled from 3/4

No activity or disturbance.
ESC13-01045 Random Inspection3/5/20143/5/20143/5/2014 10:22:54 AMPFAIL
No permit for adjacent staging lot and washout area. Muddy sidewalks, construction materials and waste still on site. no permit posted. BLD permit was already finaled but there is still work ongoing.
ESC13-00990 DOC - Permit Finaled3/5/20143/5/20143/5/2014 9:09:58 AMPPASS
Project complete. ESC conditions satisfied. All other permits finaled.
ESC12-00023 DOC - Permit Finaled3/5/20143/5/20143/5/2014 8:48:23 AMPPASS
Stormwater utilities have been installed. No further construction. Site is in process of stabilization. Will be inspected under ESC12-00036, the permit for the entire project.