Inspections for the day of: Wednesday, March 5, 2014.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEvan Jenkins
TitleEROSION CONTROL MANAGER
Phone #794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-01149 General Inspection3/5/20143/5/20143/6/2014 9:32:49 AM PASS
BMP's still inplace,
Construction signage posted
Work In Progress
No ESC Issues at time of inspection
ESC13-00693 Aging Inspection3/5/20143/5/20143/5/2014 4:07:17 PM DONE
see final
ESC13-00693 DOC - Permit Finaled3/5/20143/5/20143/5/2014 4:06:56 PMPPASS
complete
Vegetation Re-established
ESC13-01221 General Inspection3/5/20143/5/20143/5/2014 3:58:29 PM PASS
No ESC Issues at time of inspection
ESC13-00541 Aging Inspection3/5/20143/5/20143/5/2014 3:47:51 PM PASS
work in progress.
No Esc issues at time of inspection
ESC13-00577 Aging Inspection3/5/20143/5/20143/5/2014 3:43:30 PM CANC
was not able to get to this inspection in time
ESC13-01186 General Inspection3/5/20143/5/20143/5/2014 3:32:25 PM PASS
ESC13-01191 General Inspection3/5/20143/5/20143/5/2014 3:30:29 PM PASS
No ESC Issues at time of inspection
ESC13-00382 Aging Inspection3/5/20143/5/20143/5/2014 2:44:14 PM PASS
work in progress. no esc issues at time of inspection
ESC14-00056 Site Preparation3/4/20143/5/20143/5/2014 10:26:33 AMAFAIL
Gene Phone #: ###-####
Contractor already began earth disturbance. Foundation already poured and backfilled. Significant amount of earth disturbance, sediment all over the ACHD right-of-way. Called RP Gene 440.6949 and left 2 voicemails. DIsclosed no work to take place prior to Site Prep Inspection and to cleanup site (Sweep Right-of-Way, curb and sidewalks). Talked with a subcontractor and he began sweeping up sediment.