ESC14-00724
| General Inspection | 3/5/2015 | 3/5/2015 | 3/5/2015 4:32:19 PM | | PASS |
|
|
No construction occuring at site. No ESC corrections needed.
|
ESC14-00724
| DOC - Permit Finaled | 3/5/2015 | 3/5/2015 | 3/5/2015 4:30:57 PM | P | PASS |
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
ESC13-00344
| General Inspection | 3/5/2015 | 3/5/2015 | 3/5/2015 3:54:21 PM | | PASS |
|
|
Boulder Heights #5. Open hillside areas have revegetated to greater that 80%. Stormwater retention ponds are not yet fully stabilized. Streets are clean, drop inlets have filter bag protection.
No corrections at this time. Will close this permit once phase 6 begins this spring.
|
ESC14-01151
| Random Inspection | 3/5/2015 | 3/5/2015 | 3/5/2015 3:29:16 PM | P | PART |
|
|
Street,sidewalk and gutter in front project has been recently swept. Some minor accumulations of loose sediment still remain.
Corrections: 1. Need to clean up concrete washout pile, No washout containment was used 2. Re-install silt fence at downhill property line or use a wattle. 3. Put trash in a container bin
|
ESC13-00968
| Aging Inspection | 3/5/2015 | 3/5/2015 | 3/5/2015 3:12:10 PM | | PASS |
|
|
Home is complete, landscaped, and occupied. ESC permit conditions satisfied.
|
ESC13-00968
| DOC - Permit Finaled | 3/5/2015 | 3/5/2015 | 3/5/2015 3:11:44 PM | P | PASS |
|
|
|
ESC13-00755
| General Inspection | 3/5/2015 | 3/5/2015 | 3/5/2015 3:06:07 PM | | PART |
|
|
Terraces perimeter BMPs (silt fence and DI bags on MS4) are installed and in good condition. No trackout from stabilized west parking lot, staging area, or on Council Springs.
The west side of Lysted Street needs sweeping and the east construction access continues to be a source of trackout and loose sediment.
|
ESC14-00583
| Aging Inspection | 3/5/2015 | 3/5/2015 | 3/5/2015 2:53:52 PM | | PART |
|
|
Needs final cleanup around exterior and sweeping of driveway/turnaround area. No spills or discharges observed, just need to tidy and complete landscaping.
|
ESC14-00556
| Aging Inspection | 3/5/2015 | 3/5/2015 | 3/5/2015 2:52:42 PM | | PASS |
|
|
Construction complete and BLD finaled. Adjacent patio homes in Tianna Park are still in progress. No violations observed, trash is contained, no trackout, and DI bags and sand windows have protection. ESC permit finaled.
|
ESC14-00556
| DOC - Permit Finaled | 3/5/2015 | 3/5/2015 | 3/5/2015 2:51:10 PM | P | PASS |
|
|
|
ESC14-00752
| General Inspection | 3/5/2015 | 3/5/2015 | 3/5/2015 1:43:38 PM | | PASS |
|
|
No trackout or sediment leaving site. No corrections. WIP.
|
ESC15-00142
| Site Preparation | 3/4/2015 | 3/5/2015 | 3/5/2015 10:08:17 AM | A | PASS |
|
|
Olivia - Phone #: ###-####
9:30
Site inspection conducted with RP and SWPPP designer. Permit is posted a plans are onsite. Perimeter sediment control is installed properly, the wattle is weighed down with sand bags in areas where the rock surface prevented trenching and staking.
The existing driveway is sandy with some rocky road mix and should not trackout too easiliy. To start, the construction entrance is waived due to planned utility trenching in early phase of project so will monitor conditions and request entrance if trackout is a problem.
The pool and retaining walls will be built first moveing from back of lot to the front.
Site is ready for excavation.
|
ESC13-01247