BLD18-02471
| BLD-Framing/Rough-in | 3/5/2019 | 3/5/2019 | 3/5/2019 3:54:46 PM | P | PASS |
|
|
Please contact Jim Hibbard 30 minutes be fore arriving Phone #: ###-#### Inspection requested via web by James Hibbard. 1hr. lid oki.
|
BLD18-03558
| BLD-Final | 3/5/2019 | 3/5/2019 | 3/5/2019 2:58:56 PM | P | PASS |
|
|
|
BLD18-03558
| DOC - Permit Finaled | 3/5/2019 | 3/5/2019 | 3/5/2019 2:58:48 PM | P | PASS |
|
|
|
BLD18-03558
| BLD-Final | 3/5/2019 | 3/5/2019 | 3/5/2019 2:58:07 PM | P | PASS |
|
|
jack Phone #: ###-####
|
BLD19-00180
| BLD-Final | 3/5/2019 | 3/5/2019 | 3/5/2019 2:06:17 PM | P | PASS |
|
|
John Phone #: ###-####. ok for prm occ.
|
BLD19-00046
| BLD-Framing/Rough-in | 3/5/2019 | 3/5/2019 | 3/5/2019 2:05:47 PM | P | PASS |
|
|
Call for access // Santiago Phone #: ###-####. Interior steel stud framed wall for office ok.
|
BLD18-03836
| BLD-Concrete | 2/28/2019 | 3/5/2019 | 3/5/2019 1:41:20 PM | P | PART |
|
|
call for access=footing and wall- Eric Phone #: ###-####. Footing and stemwall for patio enclosure. Ok to place pending special inspection.
|
BLD18-04357
| BLD-Footing | 3/4/2019 | 3/5/2019 | 3/5/2019 1:11:30 PM | A | PASS |
|
|
Justin Phone #: ###-####. Column pad footings.
|
BLD18-02176
| BLD-Footing | 3/4/2019 | 3/5/2019 | 3/5/2019 12:06:34 PM | A | DEFR |
|
|
Early AM Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
MIS19-00061
| BLD-Conference | 3/4/2019 | 3/5/2019 | 3/5/2019 11:53:14 AM | A | FAIL |
|
|
Working without permits. Noted work with no permits.. Addition of egress windows in basement. Could not see inside but could here air compressor and tools inside. A stop work order has been posted.
|
BLD18-01425
| BLD-Framing/Rough-in | 3/4/2019 | 3/5/2019 | 3/5/2019 11:25:55 AM | A | PASS |
|
|
Zach Phone #: ###-####. Interior steel stud framed wall in area C ok to cover. Area H electrical room ok to one side to hang electrical panels.
|
BLD18-01425
| BLD-Energy code compliance | 3/5/2019 | 3/5/2019 | 3/5/2019 11:25:03 AM | A | PASS |
|
|
Zach Phone #: ###-####. Area C.
|
BLD19-00519
| BLD-Wall cover | 3/4/2019 | 3/5/2019 | 3/5/2019 8:50:41 AM | A | PASS |
|
|
Corrections will be made Phone #: ###-#### Inspection requested via web by Timothy Gammill
|
BLD19-00519
| BLD-Framing/Rough-in | 3/5/2019 | 3/5/2019 | 3/5/2019 8:50:33 AM | A | PASS |
|
|
Corrections will be made Phone #: ###-#### Inspection requested via web by Timothy Gammill
|
BLD19-00401
| BLD-Framing/Rough-in | 3/4/2019 | 3/5/2019 | 3/5/2019 8:50:02 AM | A | PASS |
|
|
Questions call Jay @ ###-#### Phone #: ###-#### Inspection requested via web by Seth Stears
|
BLD18-04384
| BLD-Energy code compliance | 3/4/2019 | 3/5/2019 | 3/5/2019 8:04:43 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|