MEC18-02531
| Mec-Aging Inspection | 3/5/2019 | 3/5/2019 | 3/6/2019 9:38:56 AM | | PASS |
|
|
called homeowner and left message about mechanical aging permit for bathroom exhaust fans. no activties since extension on 10/30/18 - doug left me a message saying WIP
|
MEC19-00901
| Final | 3/4/2019 | 3/5/2019 | 3/5/2019 4:36:38 PM | P | PASS |
|
|
Homeowner asked if you could please call her when you head her way. ###-#### Phone #: ###-#### Inspection requested via web by Kim Evans - furnace co ok
|
MEC19-00714
| Conference | 3/4/2019 | 3/5/2019 | 3/5/2019 2:58:18 PM | P | DONE |
|
|
Need to have pre rough-in inspection consultation Phone #: ###-#### Inspection requested via web by Brad Knapton - talked Brad about what needed to be finished for a R/I inspection - need to see condensate lines/rips in lineset fixed/dampers installed in supply branches/ fresh duct needs to be insulated/ access door to FA damper above ceiling - make sure FA is 10' away from any exhaust on the roof or exhaust is 3' above - FA termination cap needs bird screen in place
|
MEC19-00917
| Pressure Test | 3/4/2019 | 3/5/2019 | 3/5/2019 1:44:53 PM | P | PASS |
|
|
CONTACT: THOMAS 1-###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza - 20lb gas pressure test ok to fireplace
|
MEC19-00647
| Final | 3/4/2019 | 3/5/2019 | 3/5/2019 1:35:58 PM | P | PASS |
|
|
Hi, The code violations have been redone. Please call 30 mins ahead so we can be there to let you in. ###-#### Brian Phone #: ###-#### Inspection requested via web by Brian Preece - furnace only co ok
|
MEC19-00921
| Rough-in | 3/4/2019 | 3/5/2019 | 3/5/2019 10:58:54 AM | A | PASS |
|
|
This is a rough in and a final on a ductless split install. Please call me about 30 minutes before showing up so I can make sure you have access.
Thank you Phone #: ###-#### Inspection requested via web by Geff Blecha - ductless split final ok
|
MEC18-05666
| Conference | 3/4/2019 | 3/5/2019 | 3/5/2019 9:20:24 AM | A | DONE |
|
|
Dusty Phone #: ###-####
|
MEC18-05666
| Final | 3/5/2019 | 3/5/2019 | 3/5/2019 9:20:15 AM | P | PASS |
|
|
Dusty Phone #: ###-#### - final ok
|
MEC18-05666
| Rough-in | 3/5/2019 | 3/5/2019 | 3/5/2019 9:19:51 AM | P | PASS |
|
|
Dusty Phone #: ###-#### - two bathroom exhaust fans R/I ok
|
MEC19-00756
| Pressure Test | 3/4/2019 | 3/5/2019 | 3/5/2019 7:31:18 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Dave Sorensen Inspection cancelled from web by: Dave Sorensen
|
MEC19-00830
| Final | 2/26/2019 | 3/5/2019 | 3/4/2019 6:41:49 PM | P | CANC |
|
|
Please call prior to inspection. Ted @###-#### so he can prepare for flue test. >> Inspection requested via web by Margie Rowe Inspection cancelled from web by: Margie Rowe
|
MEC19-00130
| Rough-in | 3/4/2019 | 3/5/2019 | 3/4/2019 2:06:52 PM | A | CANC |
|
|
building A NORTH-SIDE DUCTS Phone #: ###-#### >> Inspection requested via web by Oleg Chervak Inspection cancelled from web by: Oleg Chervak
|