ELE17-02412
| ELE-Aging Inspection | 3/5/2020 | 3/5/2020 | 3/11/2020 6:05:23 AM | | DONE |
|
|
Please call the city and request an extension if more time is needed.
|
ELE20-00419
| Electrical Rough-In | 3/3/2020 | 3/5/2020 | 3/5/2020 2:40:00 PM | P | PASS |
|
|
Electrical rough-in for a solar system. Phone #: ###-#### Inspection requested via web by Bryan Lawley Items UL listed, panels match paperwork
|
ELE20-00602
| Rough-In Permanent Service | 3/4/2020 | 3/5/2020 | 3/5/2020 1:48:01 PM | P | PASS |
|
|
Customer Sean wants a call before you get there if possible. Thank you!!! ###-#### Phone #: ###-#### Inspection requested via web by Tricia Henderson Contractor going back for other work. He will finish driving last grd rod a few more inches in. p/s o/h rec ok
|
ELE20-00229
| Final | 3/5/2020 | 3/5/2020 | 3/5/2020 1:07:46 PM | P | PASS |
|
|
Got the electrical redone around the panel and grounded with two ground rods and refed 4 wires to each panel with grounds separated from neutrals. Also got service outlets added. Call with any questions thanks! Phone #: ###-#### Inspection requested via web by Trevor Soesbe Ok final. Corrections made.
|
ELE19-03017
| Electrical Rough-In | 3/5/2020 | 3/5/2020 | 3/5/2020 12:50:17 PM | P | PASS |
|
|
ceiling inspection south wing. consult on disconnect locations roof Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover ceilings S side classrooms. Disconnects for units on rooftop clearance ok.
|
ELE19-02224
| Electrical Rough-In | 3/4/2020 | 3/5/2020 | 3/5/2020 12:36:35 PM | P | PASS |
|
|
Wall rough-in inspection 3rd floor area ''A'' west block of exam rooms, all of north rooms, and south lobby. Also need conference concerning clearance of split unit 1st floor emergency electrical room 1E292. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum Ok cover areas listed. 3rd floor elec room has 3 mini splits. Center mini split cannot be above elec UPS 110.26(E)(1)(A) Equipt needs minimum 6' clearence above from any foreign systems
|
ELE20-00257
| Electrical Rough-In | 2/27/2020 | 3/5/2020 | 3/5/2020 12:01:41 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kilee Russell Items UL listed
|
ELE20-00782
| Temporary Service | 3/5/2020 | 3/5/2020 | 3/5/2020 11:44:28 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Robert Murray t/s o/h n ok
|
ELE20-00688
| Electrical Rough-In | 3/5/2020 | 3/5/2020 | 3/5/2020 11:12:55 AM | P | PASS |
|
|
Guys will be onsite Phone #: ###-#### Inspection requested via web by Jesse Simpson Items UL listed
|
ELE20-00770
| Electrical Rough-In | 3/4/2020 | 3/5/2020 | 3/5/2020 10:34:04 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Idsinga Ok cover walls 3 offices and hallway space.
|
ELE18-00250
| Electrical Rough-In | 3/4/2020 | 3/5/2020 | 3/5/2020 10:33:37 AM | A | PASS |
|
|
Gregory Phone #: ###-#### Ok cover garage and space above.
|
ELE19-04825
| Final | 3/4/2020 | 3/5/2020 | 3/5/2020 10:33:10 AM | A | PASS |
|
|
This was on a service change we did a meter panel. Any questions please give me a call thank you Phone #: ###-#### Inspection requested via web by David Kubik Ok final. Intersystem installed, panel labeled. No work done inside.
|
ELE20-00098
| Electrical Rough-In | 3/4/2020 | 3/5/2020 | 3/5/2020 9:51:33 AM | A | PASS |
|
|
rough in for the floor heat in the master bedroom only Phone #: ###-#### Inspection requested via web by Nermin Bobaric Ok cover floor heat mstr.
|