MEC96-00285
| INSP - Gas pressure test | 3/5/1996 | 3/6/1996 | 3/6/1996 12:00:00 AM | A | PASS |
|
|
ADDED EXTRA GAS LINE TO RANGE. OK Jim Sly
|
MEC96-00468
| INSP - Final | 3/5/1996 | 3/6/1996 | 3/6/1996 12:00:00 AM | A | PASS |
|
|
|
MEC96-00468
| INSP - Final | 3/5/1996 | 3/6/1996 | 3/6/1996 12:00:00 AM | A | PASS |
|
|
|
BLD95-02193
| INSP - Framing/Rough-in | 3/6/1996 | 3/6/1996 | 3/6/1996 12:00:00 AM | P | FAIL |
|
|
Correction notice.
|
BLD96-00164
| INSP - Footings | 3/4/1996 | 3/6/1996 | 3/6/1996 12:00:00 AM | P | FAIL |
|
|
Correction notice...re-bar cover and possible pour over fill. Clean out loose material and call for re-inspection.
|
MEC95-00654
| INSP - Final | 3/6/1996 | 3/6/1996 | 3/6/1996 12:00:00 AM | P | PASS |
|
|
OK Jim Sly
|
MEC95-00654
| INSP - Final | 3/6/1996 | 3/6/1996 | 3/6/1996 12:00:00 AM | P | PASS |
|
|
OK Jim Sly
|