BLD95-01819
| INSP - Framing/Rough-in | 3/5/1996 | 3/6/1996 | 3/6/1996 12:00:00 AM | A | FAIL |
|
|
10 A.M. they were late and caught me after I had posted another c/n. Numerous items still not done and engineering required for walls over 10'. I told them I would not do a punch list and for them to get the house ready for inspection. $42 reinspection fee
|
BLD96-00170
| INSP - Framing/Rough-in | 3/5/1996 | 3/6/1996 | 3/6/1996 12:00:00 AM | A | PASS |
|
|
|