BLD01-00327
| BLD-Footing | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | PASS |
|
|
###-#### Jeff...found , too 3/6/2001 12:10:11 PM
|
MEC01-00647
| Rough-in | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | PART |
|
|
jANET ###-####; c/n issued for duct penetration at garage. gas test ok 3/6/2001 1:00:23 PM
|
BLD00-03634
| BLD-Framing/Rough-in | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | FAIL |
|
|
###-####; c/n, fireblocks, insul. face paper exposed at "plenum", need specs for monokote for thermal barrier & foam sprayed at lid...complete 2hr parapet. 3/6/2001 11:51:21 AM
|
BLD00-00514
| BLD-Wall cover | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 17:02:20. Contact: ###-####....WIP; wrap beams at shaft pe 3/6/2001 4:21:41 PM r de 3/6/2001 4:21:42 PM
|
BLD01-00521
| BLD-Conference | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | PASS |
|
|
###-#### ...add headers at door 3/6/2001 3:57:58 PM
|
BLD00-01631
| BLD-Framing/Rough-in | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | PART |
|
|
for drain insp-- kim ###-#### ; drain at stairs ok; keep c/n for struct items; need proper assembly for dropped ceiling at 2nd fl. & verification of "wall finish" per specs 3/6/2001 9:00:20 AM
|
BLD01-00097
| BLD-Framing/Rough-in | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | P | PART |
|
|
fr don-- ###-#### walls ok, studs are strapped at holes 3/6/2001 4:08:38 PM
|
BLD00-02437
| BLD-Framing/Rough-in | 3/6/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | P | NR |
|
|
left msg...unable to contact 3/6/2001 4:23:53 PM
|
BLD00-00662
| BLD-Framing/Rough-in | 3/6/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | P | PART |
|
|
Walt ###-#### ok to cover 1st fl and bsmt; keep c/n re 1hr walls at stairs,complete draft stop, etc. 3/6/2001 6:37:26 PM
|
BLD00-02175
| BLD-Framing/Rough-in | 3/6/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | P | PART |
|
|
###-####; walls ok 3/6/2001 2:48:06 PM
|
BLD00-03639
| BLD-Conference | 3/6/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | P | PASS |
|
|
571--0990...c/n re gyp at 1hr stairs 3/6/2001 4:06:48 PM
|
BLD00-02377
| BLD-Conference | 3/6/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 3/6/2001 4:16:52 PM keep c/n re seismic; complete gyp at stairs for 1hr enclosure
|
BLD01-00008
| BLD-Conference | 3/6/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 3/6/2001 6:25:14 PM w/bldr rec/n
|
BLD99-02394
| BLD-Conference | 3/6/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 3/6/2001 6:24:09 PM w/arch re 1hr stair ways
|
BLD00-02752
| BLD-Framing/Rough-in | 3/6/2001 | 3/6/2001 | 3/7/2000 12:00:00 AM | A | PART |
|
|
John ###-#### roof nailing; 65 sq. west of penthouse ok 3/7/2001 9:23:24 AM
|