MEC01-00312
| Conference | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | PASS |
|
|
talked to poncho on phone about how he wanted to call for inspections, wanted to do this space in sections. i told him it was ok to do in sections of parts then a final when done at the finish of project 3/6/2001 10:39:23 AM
|
MEC01-00120
| Pressure Test | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | PASS |
|
|
pres test ###-#### cell -ed
|
MEC01-00648
| Final | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | PART |
|
|
replace bath exhaust duct and recall when grid and diff. are in 3/6/2001 10:08:06 AM
|
MEC01-00614
| Rough-in | 3/6/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | PART |
|
|
r/i ok for office only 3/6/2001 9:46:04 AM
|
MEC01-00312
| Rough-in | 3/6/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | PART |
|
|
r/i, ok, ok for cover on north-east section of area 3/6/2001 11:21:14 AM
|
MEC01-00377
| Final | 3/6/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 09:20:40. Contact: ###-####.
|
MEC01-00376
| Final | 3/6/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 09:21:22. Contact: ###-####.
|
MEC01-00606
| Pressure Test | 3/6/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | P | CANC |
|
|
JIM ###-#### MED. GAS TEST plm
|
MEC01-00447
| Final | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 16:09:42. Contact: ###-####.
|