PLM01-00324
| Final | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | PASS |
|
|
Wanda ###-#### -please call before you go out... shell and core pluming bathroom backflow cert. water heater install owner to be responsible for operation of sump pump in basement for relief valve drain 3/6/2001 9:41:31 AM
|
PLM01-00558
| Plumbing Rough-in | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | NR |
|
|
Ediger Plumbing ###-####4
|
PLM00-04408
| Water and/or Sewer | 3/6/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | P | PASS |
|
|
###-####air test ok roof drain lines 3/6/2001 11:16:23 AM
|
PLM01-00245
| Final | 3/6/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 08:51:07. Contact: ###-####.
|