BLD00-03155
| BLD-Footing | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | NR |
|
|
Duane ###-####
|
BLD00-01844
| BLD-Framing/Rough-in | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | FAIL |
|
|
Phil ###-####
c/n posted, need fire sprinklers signed off, ok to insulate after trades sign off 3/6/2001 1:19:40 PM
|
BLD00-03185
| BLD-Concrete | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 14:33:41. Contact: ###-####.
masonary, bond beams, plates, wip, ok pending special inspector report 3/6/2001 9:42:36 AM
|
MEC01-00640
| Final | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 15:14:05. Contact: ###-####.
rouph inspection ok 3/6/2001 11:14:21 AM
|
BLD00-03619
| BLD-Framing/Rough-in | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 17:06:01. Contact: ###-####.
ok to insulate 3/6/2001 11:14:42 AM
|
BLD00-03617
| BLD-Framing/Rough-in | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 17:06:55. Contact: ###-####.
not ready 3/6/2001 11:13:11 AM
|
BLD00-03236
| BLD-Foundation | 3/5/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 18:11:53. Contact: ###-####.
wip, ok w/ verbal corrections 3/6/2001 11:15:18 AM
|
BLD01-00039
| BLD-Framing/Rough-in | 3/6/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | A | CANC |
|
|
###-#### Vern
wanted a pm inspection not am 3/6/2001 11:22:13 AM
|
BLD01-00039
| BLD-Framing/Rough-in | 3/6/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 415 On 3/6/2001 11:18:44 AM
ok to insulate 3/6/2001 3:22:18 PM
|
BLD01-00311
| BLD-Final | 3/6/2001 | 3/6/2001 | 3/6/2001 12:00:00 AM | P | PASS |
|
|
###-#### fred\\two egress windows
ok after sealing around window frame 3/6/2001 1:33:00 PM
|