MEC02-00583
| Final | 3/4/2002 | 3/6/2002 | 3/6/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 14:15:08. Contact: ###-####.
|
BLD01-03154
| BLD-Framing/Rough-in | 3/5/2002 | 3/6/2002 | 3/6/2002 12:00:00 AM | A | FAIL |
|
|
###-#### C/N Need trade R/I s approved. air seal Appr plans and Eng. 3/6/2002 12:18:21 PM
|
MEC01-03667
| Final | 3/5/2002 | 3/6/2002 | 3/6/2002 12:00:00 AM | A | PASS |
|
|
fn -reinsp-mike ###-####--key on window sill above front door
|
MEC02-00201
| Final | 3/5/2002 | 3/6/2002 | 3/6/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/05/2002 at 15:24:28. Contact: ###-####.
|
BLD02-00132
| BLD-Framing/Rough-in | 3/6/2002 | 3/6/2002 | 3/6/2002 12:00:00 AM | P | PASS |
|
|
###-#### STEVE Energy OK 3/6/2002 2:25:43 PM
|
BLD01-01990
| BLD-Final | 3/5/2002 | 3/6/2002 | 3/6/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/05/2002 at 13:17:20. Contact: ###-####. C/N on site. 3/6/2002 1:39:19 PM
|
BLD02-00104
| BLD-Framing/Rough-in | 3/5/2002 | 3/6/2002 | 3/6/2002 12:00:00 AM | P | PART |
|
|
shear nail john -###-#### Shear OK. 3/6/2002 2:56:25 PM
|