Inspections for the day of: Wednesday, March 6, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMarv Burrus
TitleELE
Phone #340-1297
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE02-00045 Electrical Rough-In3/5/20023/6/20023/6/2002 12:00:00 AMAPASS
steve -###-#### cell for conf for homeowner-
conference: kitchen remodel. future service change. 3/6/2002 9:25:22 AM
ELE01-02496 Final3/5/20023/6/20023/6/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/05/2002 at 13:50:06. Contact: ###-####.
ELE02-00595 Electrical Rough-In3/5/20023/6/20023/6/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/05/2002 at 14:47:03. Contact: ###-####. suite 520 walls r/i. 3/6/2002 12:05:33 PM
ELE02-00288 Final3/5/20023/6/20023/6/2002 12:00:00 AMAPASS
fn insp-- brett ###-#### - basement/storage room r/i. 3/6/2002 9:45:58 AM
ELE02-00556 Final3/5/20023/6/20023/6/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/05/2002 at 15:56:33. Contact: ###-####. relocated meter base; corrections completed.

p/s ug re mitchell ele #0556-ok 3/6/2002 10:13:43 AM
ELE02-00165 Final3/6/20023/6/20023/6/2002 12:00:00 AMPPASS
###-#### DAVE
ELE01-03858 Rough-In Permanent Service3/6/20023/6/20023/6/2002 12:00:00 AMPPASS
###-#### BILL KEY IS IN BOTTOM MAIN DISCONNECT. corrections completed.

p/s ug ne challenger ele #3858-ok
pump station. 3/6/2002 2:20:35 PM
ELE01-03860 Rough-In Permanent Service3/6/20023/6/20023/6/2002 12:00:00 AMPPASS
###-#### BILL KEY IS IN BOTTOM MAIN DISCONNECT. corrections completed.

p/s ug new challenger ele #3860-ok
pump station. 3/6/2002 2:21:33 PM
ELE01-04186 Final3/6/20023/6/20023/6/2002 12:00:00 AMPPASS
fn doug- ###-####/if possible call 1/2 before insp for access