Inspections for the day of: Wednesday, March 6, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-00646 Pressure Test3/5/20023/6/20023/6/2002 12:00:00 AMAPASS
A-1 FIREPLACE ###-####
MEC02-00646 Final3/5/20023/6/20023/6/2002 12:00:00 AMAPASS
A-1 FIREPLACE ###-####
BLD01-01109 BLD-Other3/5/20023/6/20023/6/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/05/2002 at 11:49:08. Contact: ###-####. ceiling grid in new nurses station 3/6/2002 1:00:00 PM
BLD02-00178 BLD-Framing/Rough-in3/5/20023/6/20023/6/2002 12:00:00 AMAPART
###-#### shear ok needs elec r/i and seal package 3/6/2002 11:36:35 AM
BLD02-00319 BLD-Framing/Rough-in3/5/20023/6/20023/6/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/05/2002 at 16:48:43. Contact: ###-####.
BLD01-03126 BLD-Final3/6/20023/6/20023/6/2002 12:00:00 AMPPASS
###-#### ok for perm occ 3/6/2002 5:03:53 PM
BLD02-00277 BLD-Final3/6/20023/6/20023/6/2002 12:00:00 AMPPASS
###-#### PAUL
BLD01-01188 BLD-Final3/6/20023/6/20023/6/2002 12:00:00 AMPFAIL
fn -travis -###-#### org c/n not completed 3/6/2002 2:38:25 PM
BLD01-01189 BLD-Final3/6/20023/6/20023/6/2002 12:00:00 AMPFAIL
###-####- travis re-insp c/n on site 3/6/2002 2:37:38 PM
MEC01-03052 Final3/6/20023/6/20023/6/2002 12:00:00 AMPPASS
Scheduled by Inspector: 425 On 3/6/2002 1:45:40 PM
BLD02-00028 BLD-Final3/5/20023/6/20023/6/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/05/2002 at 14:39:47. Contact: ###-####.