FIR02-00454
| FIR-Aging Inspection | 3/6/2003 | 3/6/2003 | 3/6/2003 12:00:00 AM | | NR |
|
|
work is still in progress and resubmittals are coming per e-mail from Bill Alexander 3/6/2003 1:03:41 PM
|
FIR02-00439
| INSP-Final Inspection | 3/6/2003 | 3/6/2003 | 3/6/2003 12:00:00 AM | A | FAIL |
|
|
sprinkler head at 7 ft level in east comm room; ceiling height requires removal of this head as there are two at ceiling height; need timeline for correcting standpipe interconnection and sprinklering all unsprinklered areas as requested on plan review notes
|
BLD02-01413
| FIRE-Final Inspection | 3/5/2003 | 3/6/2003 | 3/6/2003 12:00:00 AM | A | FAIL |
|
|
###-#### need timeline for fixing standpipe interconnection and sprinklering all areas; remove head in east comm room; need standard response sprinklers on second floor as QR's were installed; need max occupant load sign in training room 3/6/2003 1:02:30 PM
|
FIR02-00514
| INSP-Alarm Testing | 3/5/2003 | 3/6/2003 | 3/6/2003 12:00:00 AM | A | PASS |
|
|
Rick the earlier the better for us. Please Call Thanks Mike; Phone #: ###-#### Internet Inspection Request from: Mike Timmerman
|