Inspections for the day of: Monday, March 6, 2006.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-03477 FIRE-Final Inspection3/3/20063/6/20063/7/2006 3:34:45 PMPPASS
Life safety is acceptable for the permitted work.
BLD05-02536 FIRE-Final Inspection3/6/20063/6/20063/6/2006 4:41:30 PMPDEFR
Inspection to be completed 3/7 per phone conversation with contractor.
FIR05-00813 INSP-Final Inspection3/6/20063/6/20063/6/2006 4:39:46 PMPDEFR
To be completed 3/7 per agreement.
BLD05-02536 FIRE-Final Inspection3/6/20063/6/20063/6/2006 4:39:04 PMACANC
Duplicate inspection request.
BLD02-02178 FIRE-Final Inspection3/6/20063/6/20063/6/2006 4:33:07 PMPPASS
The required corrections have been completed, life safety finaled.
BLD02-02177 FIRE-Final Inspection3/6/20063/6/20063/6/2006 4:32:00 PMPPASS
Required corrections have been made, life safety finaled.
FIR06-00035 INSP-Final Inspection3/3/20063/6/20063/6/2006 4:05:47 PMPPASS
Defficient items have been corrected, fire alarm work passed inspection.
FIR05-00192 INSP-Conference3/3/20063/6/20063/6/2006 3:26:43 PMADONE
On site confrence to discuss a/v notification location requirements for concoure B.
FIR05-00880 INSP-Final Inspection3/2/20063/6/20063/6/2006 3:24:24 PMAPART
7 AHU duct smoke detectors tested okay, 2 AHU detectors are not installed at this time, a ceiling will be required at the riser/FACP room which will require relocation and testing of the SD at the panel, need to test flow switches at the main riser (contractor unable to flow water at this time), tamper switch at antifreeze system point #6 needs adjustment, need to test low air and the WPI tamper at south riser as contractor had not made preparation to do so, provide signage at the door to the FACP.
FIR05-00425 INSP-Conference3/2/20063/6/20063/6/2006 11:58:55 AMADONE
Contractor called in the wrong permit number, was intended for a BLD life safety confrence to discuss fire code review notes with respect to a temp. occupancy request for the parking garage.
BLD06-00015 FIRE-Conference3/3/20063/6/20063/6/2006 11:03:25 AMADONE
On site discussion regarding tenant improvement modifications that affect fire sprinkler protection and coverage, the proposed work will require a fire sprinkler permit.
FIR06-00060 INSP-Final Inspection3/3/20063/6/20063/6/2006 10:34:35 AMAPART
Overhead rough-in is acceptable for cover at the drop and hard lid ceiling areas, permit final pending installation of ceiling tile and sprinkler escutcheons.
FIR06-00103 INSP-Sprinkler Rough-in/Hydro3/3/20063/6/20063/6/2006 10:07:39 AMAPART
Overhead rough-in is good for cover at the drop ceiling areas.
BLD05-03236 FIRE-Final Inspection3/3/20063/6/20063/6/2006 9:40:49 AMAPASS
Fire life safety is acceptable, the new extinguisher to be tagged for certification today.
FIR05-00428 INSP-Final Inspection3/3/20063/6/20063/6/2006 8:53:02 AMANR
Per phone conversation with Brad of TVFP the project is not ready for inspection at this time.